Pre-Bid Conference: A mandatory Pre-Bid ("Project Walk") will occur on November 3, 2026, at 10am at OYA's MacLaren Youth Correctional Facility. See Section 5.4 of the RFQ for additional information and requirements.
OYA is seeking Quotes to install four (4) HVAC units at MYCF located at 2630 North Pacific Highway, Woodburn, Oregon 97071. The work includes replacing existing units at MYCF Geer with two (2) new 12.5-ton Trane Precedent Package Rooftop Units with Economizers WSK150A3SON** or equivalent, with transition ducting as required, utilizing existing concrete pads and controls, condensate piping and disposal of old units. At MYCF Timberline, replace existing units with two (2) new 7.5-ton Trane Precedent Package Rooftop Units with Economizers WSK090A3SON** or equivalent, with transition ducting as required, utilizing existing concrete pads and controls, condensate piping and disposal of old units. Exclusions include high voltage electrical connections, concrete equipment pads, and natural gas piping.
We post new hvac opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oregon work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: OregonBuys (bid S-41500-00018272), retrieved via the OregonBuys statewide open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.