BRIDGE REHABILITATION
US-56: OVER UNNAMED CREEK, 2.14 MILES WEST OF
THE SH-171 JUNCTION NEAR KEYES.
PROJECT LENGTH = 0.086 MILES
The project includes roadway items such as unclassified excavation, borrow, temporary silt fence, solid slab sodding, aggregate base, subgrade, traffic bound surface course, tack coat, prime coat, Superpave asphalt types S3 and S4, cold milling pavement, beam guardrail, guardrail end treatment, and fence. Bridge work includes structural excavation, temporary earth retainage, class AA concrete, pneumatically placed concrete, epoxy coated reinforcing steel, crack preparation and epoxy resin, and removal of bridge items. Traffic temporary items include portable traffic signal system, removable pavement marking tape, pavement marking removal, construction signs of various sizes, wing barricades, warning lights types A, B, and C, drums, channelizer cones, and portable changeable message signs. Permanent traffic striping and mobilization are also included.
We post new structural work opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 270031), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.