PEDESTRIAN IMPROVEMENTS AND SIDEWALKS
SH-76: FROM THE INTERSECTION OF CITY STREET (1ST STREET),
EXTEND EAST IN THE CITY OF HEALDTON.
PROJECT LENGTH = 0.303 MILES
The project includes pedestrian improvements and sidewalks on SH-76 from the intersection of City Street (1st Street) extending east in the City of Healdton, project length 0.303 miles. Work items include temporary fiber log, aggregate base type A, class A concrete, epoxy coated reinforcing steel, combination curb and gutter, 4-inch concrete sidewalk, 6-inch concrete driveway, tactile warning device, stamped concrete finish, manhole adjustment, removal of curb/gutter/pavement/driveway/sidewalk, sawing pavement, pipe railing, arrow display, construction signs, barricades, warning lights, channelizer cones, portable changeable message sign, remove and reset existing signs, sheet aluminum signs, square tube post, traffic stripe, pavement marking removal, construction staking level II, and mobilization.
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 270030), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.