PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
CITY STREETS (SOUTH SANTA FE DRIVE / WEST HURD STREET):
AT MULTIPLE LOCATIONS IN THE CITY OF EDMOND.
PROJECT LENGTH = 0.451 MILES
Work includes clearing and grubbing, unclassified excavation and earthwork, temporary silt fence and sediment filter, solid slab sodding, watering and fertilizing, tree removal, aggregate base, granular backfill, Class C concrete, parking blocks, concrete curb and combined curb and gutter, 4-inch and 6-inch concrete sidewalk, 6-inch concrete driveway, tactile warning devices, manhole, inlet, water meter and water valve adjustments, corrugated galvanized steel pipe and prefabricated culvert end sections, curb, driveway and sidewalk removal, traffic signing and striping, decorative poles and mast arms with roadway luminaires, PVC conduit, pull boxes, structural concrete, reinforcing steel and electrical conductor, railroad flagging, construction traffic control and portable changeable message signs, construction staking and mobilization, with 120 calendar days to complete.
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260293), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.