RESURFACE (ASPHALT)
SH-15: FROM 7.58 MILES EAST OF THE US-177 INTERSECTION, EXTEND EAST NEAR PAWNEE.
PROJECT LENGTH = 7.27 MILES
The project involves asphalt resurfacing of SH-15 from 7.58 miles east of the US-177 intersection extending east near Pawnee, covering 7.27 miles. Work items include aggregate base type A (1,344 CY), traffic bound surface course type E (2,848 tons), NT tack material (6,835 gallons), Superpave type S3 patch (1,008 tons), BMD type B4 (11,781 tons), cold milling pavement (3,649 SY), rumble strip centerline HMA (38,365 LF), traffic stripe (plural-component) in 6-inch width (139,100 LF) and 24-inch width (175 LF), arrow display type C (17 SD), construction signs of various sizes (360 SF, 350 SF, 887 SF), construction barricades type III (160 SD), warning lights type B (887 SD), channelizer cones (2,707 SD), flaggers (45 SD), portable changeable message signs (104 SD), and mobilization (1 LSUM).
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 270022), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.