GRADE, DRAIN AND SURFACE
COUNTY ROADS (NS 2520/EW 0940): FROM 10.0 MILES WEST
OF THE US-270 JUNCTION, EXTEND WEST AND SOUTH NEAR
AMERICAN HORSE LAKE.
The work includes earthwork (1 LSUM), temporary silt fence (246 LF), temporary silt dike (28 LF), solid slab sodding (220 SY), aggregate base type A plant mixed (32 CY), geogrid reinforcement (139 SY), traffic bound surface course type E (54 TON), tack coat (11 GAL), prime coat (45 GAL), Superpave type S3 (33 TON), Superpave type S4 (16 TON), class C concrete (2.3 CY), type I plain riprap with filter blanket (733 TON), 42" R.C. pipe class IV (150 LF), 18" corr. galv. steel pipe (80 LF), type DD3 culvert end treatment (2 EA), type A4 culvert end treatment (2 EA), removal of fence (774 LF), fence-style SWF (5 barbed wire) (424 LF), fence-style SWF (6 barbed wire) (650 LF), traffic stripe (plural-component) (4" wide) (117 LF), construction traffic control (30 SD), construction staking level II (1 LSUM), SWPPP documentation and management (1 LSUM), and mobilization (1 LSUM).
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260306), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.