MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF NC 11 FROM BRIDGE 64 TO SR 1720
Contract: DB00631 — POC
Letting: NCDOT Division 2 — bids open 10-14-2026
Documents: DB00631 INVITATION.pdf (Invitation to Bid); DB00631 PLANS.pdf (Plans); DB00631 PROPOSAL.pdf (Proposals)
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN DANIEL H. JOHNSON
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION 2
PROJECT DEVELOPMENT GROUP
GREENVILLE, NC 27834
Telephone: (252) 439-2828
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
1037 W.H. SMITH BLVD.
GREENVILLE, NC 27834
September 16, 2026
CONTRACT: DB00631
WBS ELEMENT: 2027CPT.02.01.10541
COUNTY: LENOIR
ROUTE: NC 11
DESCRIPTION: MILLING, RESURFACING, AND SHOULDER
RECONSTRUCTION OF NC 11 FROM BRIDGE 64 TO SR
1720
NOTICE TO PROSPECTIVE BIDDERS
INVITATION TO BID ON PURCHASE ORDER CONTRACT
The North Carolina Department of Transportation is requesting bids for the above
referenced project. The contractor must furnish all labor, materials, equipment, and any
other items necessary for the completion of this contract.
BID OPENING
Electronic bids must be received at the Division 2 Project Development Office, Located
at 1037 W.H. Smith Blvd., Greenville, by Wednesday, October 14, 2026 at 2:00 PM.
Bids for this project must be submitted electronically using the on-line system Bid
Express®. Refer to the Instructions to Bidders in the proposal for more information.
The North Carolina Department of Transportation, in accordance with the provisions of
Title VI of the Civil Rights Act of 1964 (78 Stat. 252) and the regulations of the
Department of Transportation (49 CFR, Part 21), issued pursuant to such act, hereby
notifies all bidders that it will affirmatively ensure that the contract entered into pursuant
to this notice will be awarded to the lowest responsible bidder without discrimination on
the grounds of sex, race, color, or national origin.
The contractor must mill the full width of the entire roadway to a depth of 1.5 inches, including incidental milling at the ends of the main line and Y-line sections. Place asphalt surface course S9.5C and S9.5D at full width of the existing asphalt pavement at an average rate of 168 lbs. per sq. yd. Perform shoulder reconstruction after paving is completed, with a minimum slope of 1 inch per foot to ensure positive drainage. The work also includes curb and gutter removal/replacement, concrete valley gutter removal/replacement, temporary silt fence, wattle, seed and mulching, erosion control, and temporary traffic control signing.
We post new asphalt opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00631 INVITATION.pdf""Invitation to Bid""DB00631 INVITATION.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF NC 11 FROM BRIDGE 64 TO SR 1720""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00631 PLANS.pdf""Plans""DB00631 PLANS.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF NC 11 FROM BRIDGE 64 TO SR 1720""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00631 PROPOSAL.pdf""Proposals""DB00631 PROPOSAL.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF NC 11 FROM BRIDGE 64 TO SR 1720""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00634 INVITATION.pdf""Invitation to Bid""DB00634 INVITATION.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF US-17 (US 17 BYPASS) FROM JONES COUNTY TO US-70""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00634 PLANS.pdf""Plans""DB00634 PLANS.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF US-17 (US 17 BYPASS) FROM JONES COUNTY TO US-70""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00634 PROPOSAL.pdf""Proposals""DB00634 PROPOSAL.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF US-17 (US 17 BYPASS) FROM JONES COUNTY TO US-70"Most North Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: North Carolina Department of Transportation (solicitation DB00631-2026-10-14), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.