(1): Job JNWM0139 Route 752 BUCHANAN County. Replace traffic signals at the intersection of King Hill Avenue, the total length of improvement being 0.027 miles.
Bid opening: 12/18/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes removal of existing improvements, furnishing and installing changeable message signs, temporary traffic control, mobilization, surveying and staking, signal heads (Type 3S, 3B, 4B, and pedestrian), signal signs and mounting hardware, LED luminaires, signal posts (Type CL, 35 ft and 40 ft arms), controller assembly housing with NEMA TS2 controller, pushbutton detectors, conduit (1 in., 3 in., 4 in.), various cables (10 AWG, 8 AWG, 16 AWG 2-conductor, 16 AWG 5-conductor, 16 AWG 7-conductor, loop detector, loop detector lead-in), pull boxes (Class 1, 2, 3), concrete base, and vehicle induction loop detectors (2-channel, shelf mounted, installed). The work is to be performed in four phases as described in the Contract Order of Work, with specific traffic control requirements.
We post new electrical opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261218-A03), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.