642-22-104, 36C24426R0088, Upgrade Substation Building 2, Phase 1, PHL CMCVAMC
Proposal Due Date: 11/20/2026 at 4:00pm EST. Email proposals to Kevin Rodgers at kevin.rodgers2@va.gov.
This project will replace Electrical Substations 1 and 2 with new 480/277V substations each containing a 1500 kVA transformer.
The contractor shall replace Electrical Substations 1 and 2 with new 480/277V substations each containing a 1500 kVA transformer. A temporary 480/277V substation with a 1500 kVA transformer shall be installed to maintain electrical service during demolition and construction, and shall remain as a spare upon completion. All work shall be phased to minimize service outages and maintain continuous operation of the medical center. The work includes demolition, construction of a new electrical room, replacement of feeders, transformers, control systems, and a complete arc flash hazard analysis. Mechanical work includes designing and installing the required HVAC cooling system. The contractor must also provide performance and payment bonds.
We post new electrical opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""15215""PITTSBURGH""PA""USA""1010 DELAFIELD ROAD""36C24426R0088 0004.pdf"94446"file"".pdf""1""2026-11-20T19:30:43.087+00:00""74bfd55789964ca49bd8a0278cf3935f""public""0""public""320d57f86ef3483488c5bb58a4118ecf""0"46"0""RFI 2 Upgrade Substation 36C24426R0088.docx"22247"file"".docx""1""2026-11-20T19:30:43.087+00:00""9318b669f10a49939c4c61b9a77ffa8a""public""0""public""f3b03b792ef3428f9976318a1e2ac65f""0"45"0""VHA Dir 7714 Asbestos Management Program.pdf"132578"file"".pdf""1""2026-11-20T19:30:43.087+00:00""513c2be22c3a4930bb4abec749ea14a7""public""0""public""d012a2b57f844c6f9d22eafea1fc03a8""0"44"0""ALL-31-SINGLE-LINES-ONE-FILE-012325.pdf"30126361"file"".pdf""1""2026-11-20T19:30:43.087+00:00""18a641f907e344e0ab1cf0216897205a""public""0""public""a2906d4941dc4930a91696b528db1525""0"43"0""MANHOLES 19529-02 VA Hospital of Philedelphia 11.17.22.pdf"15735599"file"".pdf""1""2026-11-20T19:30:43.087+00:00""bfa9f628bfb34480bbf9ac15b4b16d33""public""0""public""4fa7f0b7aa044582a30f3e89b2eedafc""0"42"0""Building 2_LS_SB_G_B FOR REFERENCE ONLY.pdf"1291939"file"".pdf""1""2026-11-20T19:30:43.087+00:00""d3c20d7cf4414f49bcc14d420fc57988""public""0""public""ce7ee4292be64d5e8d26969d0bad608c""0"41"0""Confined Space Entry Program.pdf"849574"file"".pdf""1""2026-11-20T19:30:43.087+00:00""4569c3545fec4cc781010ce13e6d991b""public""0""public""d48466ba4e024b9daf4c480eb5a8e892""0"40"0""B6-SITE-POWER-WITH-MANHOLES-DWG-FINAL-070623.pdf"762043"file"".pdf""1""2026-11-20T19:30:43.087+00:00""a3889768c2eb416285aca5851e7585a4""public""0""public""f0b00435e6334a05a57beccd71a5be67""0"39"0""B02-SUB-4.pdf"681126"file"".pdf""1""2026-11-20T19:30:43.087+00:00""faafc3c1135b401db533aff5357eb330""public""0""public""670a9f3f6d214f2081b97c45e9c88e49""0"38"0""B02-SUB-3.pdf"695770"file"".pdf""1""2026-11-20T19:30:43.087+00:00""95a4112a98b04fd3b0e2e3fb936e69df""public""0""public""1a180e226c3b4ac4a82fd81c256b671a""0"37"0""B02-SUB-1.pdf"701843"file"".pdf""1""2026-11-20T19:30:43.087+00:00""c5d8b7ee0d014f72ac478da12d48b957""public""0""public""357b4a0927104e70a4f19b49bce11c1f""0"36"0""B02-SUB-2.pdf"689907"file"".pdf""1""2026-11-20T19:30:43.087+00:00""a15ac9fbc2c74259bdb339e15a120696""public""0""public""0a83dbdc97494b89bcec1555ad884d91""0"35"0""2024-12-03_Green Procedure Program.pdf"459682"file"".pdf""1""2026-11-20T19:30:43.087+00:00""b12fd47f96a846f49da08bd26745e1d4""public""0""public""60025aff11c541d2b6b9161ce54438a8""0"34"0""VHA ICRA-1.2 Oct 1 2024.pdf"384383"file"".pdf""1""2026-11-20T19:30:43.087+00:00""c260bd1c44fb44cf900600ed773972a6""public""0""public""b2eef30a0f8d4f83914a25ef1a748780""0"33"0""2024-12-03_HAZARDOUS AND UNIVERSAL WASTE POLICY.pdf"407468"file"".pdf""1""2026-11-20T19:30:43.087+00:00""060bf365368e4752b75193c576b2f042""public""0""public""446d71b65b5c421aa9676e23df36d637""0"32"0""Asbestos Control Regulation.pdf"455203"file"".pdf""1""2026-11-20T19:30:43.087+00:00""d0ac2e1ccefb4c8090807026220eaa74""public""0""public""75b7d5fa40f1482abefb27d43c54a4fe""0"31"0""Fire Plan.pdf"297461"file"".pdf""1""2026-11-20T19:30:43.087+00:00""d577fd826fcf49f3b437be08b6398910""public""0""public""73093dc26e5b4f918fcb186427ac21a6""0"30"0""Safety Coordination Meeting Safety Policies for SOW Project 642-22-104.pdf"2778553"file"".pdf""1""2026-11-20T19:30:43.087+00:00""5b1201c229ea4364a09c00ed34d7e826""public""0""public""c286ee17d3104036a8eb4f2e32102bad""0"29"0""2024-12-03_HAZARDOUS MATERIALS AND WASTE MANAGEMENT PLAN.pdf"258338"file"".pdf""1""2026-11-20T19:30:43.087+00:00""0e4a2255b237401a9a21915ea3429fc5""public""0""public""a36f9462c4f243f4876724213c2ef2fc""0"28"0""Electrical Safety Program.pdf"230413"file"".pdf""1""2026-11-20T19:30:43.087+00:00""4fd1f5acf10843c1b51d540dd663cfdc""public""0""public""e203563b4ea34670bfcaeb112cb5c931""0"27"0""FMS SOP 138-54 Hot Work Policy.pdf"163156"file"".pdf""1""2026-11-20T19:30:43.087+00:00""f2f80a7ea0834c3c8a8d015c7d114810""public""0""public""ecd630749bbc45319d00b7d75b52b89a""0"26"0""FIRE SYSTEM permit 2021 blank.pdf"193244"file"".pdf""1""2026-11-20T19:30:43.087+00:00""b5a4e8a94b134866bb0328f337639554""public""0""public""0bcfd5ac584449239e81a4a0b9c46856""0"25"0""7714_D_2017-04-06 ASBESTOS MANAGEMENT PROGRAM.pdf"132578"file"".pdf""1""2026-11-20T19:30:43.087+00:00""50e49cb9d14649049fb01124affdca88""public""0""public""d8a6298a342a429aaf8d592a9dfbe6f3""0"24"0""FMS SOP 138-44 Fire and Smoke Barrier Penetration Policy.pdf"77419"file"".pdf""1""2026-11-20T19:30:43.087+00:00""9750b846a2e245209a75adc53d38107d""public""0""public""7cc58f9cdd43440386f9b61dbc0328c3""0"23"0""Fire and Smoke Barrier Pentration Permit.pdf"86402"file"".pdf""1""2026-11-20T19:30:43.087+00:00""588ed718244749f8a8bffd6fcdb4b5fe""public""0""public""acc1f960ea094c07afe2143e9c6855e8""0"22"0""B6-SUB-PRIMARY-NORMAL-324-371-DWG-FINAL-070623.pdf"419557"file"".pdf""1""2026-11-20T19:30:43.087+00:00""5bcd6a1dccf14f4ea99dd8b6f940d14d""public""0""public""728b9eccd1ab4729b80b717b8bbcae64""0"21"0""SAFE PRACTICES FOR WORKING WITH LIVE ELECTRICAL POWER.pdf"381252"file"".pdf""1""2026-11-20T19:30:43.087+00:00""67665f82dad945b788ff84a01739bf8c""public""0""public""0460c3630d4f446ead5bf596929076a0""0"20"0""Safety and Health During Construction.pdf"235192"file"".pdf""1""2026-11-20T19:30:43.087+00:00""f4a400dd6c9746db8b394b29d694e73f""public""0""public""b1b9c4c3d7894537957cf2f69014b07e""0"19"0""Inspection Final RAC Blank Master.docx"100642"file"".docx""1""2026-11-20T19:30:43.087+00:00""5c0a241713c243bbb91e837b2568e7d6""public""0""public""69c1341e38d8447e86384ed597b5882e""0"18"0""INFECTION PREVENTION AND CONTROL POLICY BEHAVIORAL HEALTH SERVICES.pdf"157210"file"".pdf""1""2026-11-20T19:30:43.087+00:00""d54e9e6132d445719330906d82bce96b""public""0""public""3c1a398c702249d285be3a95a110b5a7""0"17"0""FMS 138-54 Hot Work Policy.doc"45056"file"".doc""1""2026-11-20T19:30:43.087+00:00""1b6008a5ae83494baa0d1a8798b26e09""public""0""public""90be77830a3f43d4ab5fa43ac31b1d93""0"16"0""Blank Above Ceiling Permit.pdf"34522"file"".pdf""1""2026-11-20T19:30:43.087+00:00""cd10031c5fcb4dc3bb89cdb61c46ddeb""public""0""public""4c39113b294147f4b9b1f2559f085196""0"15"0""36C24426R0088 0003.pdf"100294"file"".pdf""1""2026-10-27T11:48:23.614+00:00""d1f5fd2c8a79454aa7b67929ab679832""public""0""public""c92f256f749340f1b327c5692e3515dc""0"14"0""Attachment 1 RFI 1 Upgrade Substation 642-22-104.docx"29075"file"".docx""1""2026-10-23T13:44:43.14+00:00""ecb73559690941449adedb0f503a5fb5""public""0""public""d9d00ae7dab344e1b88ab1179bcf6c2f""0"13"0""Attachment 3 General Decision Number PA20260003 10012026.docx"28560"file"".docx""1""2026-10-22T19:08:55.797+00:00""483872d42a6c4f9c8fae6c95e9cdf8e0""public""0""public""5fcdb40b1b794ce79f3ec0e357df689d""0"10"0""Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx"50819"file"".docx""1""2026-10-22T19:08:55.797+00:00""811d2ee97299409792b08897faa3e5a6""public""0""public""83c79bd6c46442ff89de90b256858739""0"9"0""36C24426R0088 0002.docx"120710"file"".docx""1""2026-08-31T11:59:06.152+00:00""38f3a35d8e8f43ae861cb79b67ec8ba0""public""0""public""6abe6b1f5ce84f2db4b0234a1e7872f6""0"6"0""36C24426R0088 0001.docx"122058"file"".docx""1""2026-08-04T18:56:49.287+00:00""6e059744bec743c2aadf2665558a06ba""public""0""public""735cd672b87d45f4a405e088e8d712ab""0"5"0""S04 Pre-Bid Sign-In Sheet 36C24426R0088 - 642-22-104 - Upgrade Substation.pdf"109334"file"".pdf""1""2026-08-04T18:56:49.287+00:00""e5659aa25f0f41fdbf37352f6886c5b5""public""0""public""643e0cb6233e49a6b60f9c9f8f24f670""0"4"0""Substations Upgrade Building 2-Phase 1_Bid Documents_Specification_10-21-24.pdf"2228585"file"".pdf""1""2026-07-02T21:31:05.943+00:00""15de5f9fe82d4361b39d6add7aafaeb5""public""0""public""be4c867c82664eb3a45f2f6409c0428b""0"3"0""Substations Upgrade Building 2-Phase 1 Combined Drawings.pdf"38093199"file"".pdf""1""2026-07-02T21:31:05.943+00:00""4f18318e9e9b433e82fb1e2f588295f1""public""0""public""815c58c3bd3848919efb994052568304""0"2"0""36C24426R0088_1.docx"160262"file"".docx""1""2026-07-02T21:31:05.943+00:00""eaae4f31654244009e8eb238eaf6f424""public""0""public""97a6b2451b6f4dad99ea2b9190afb18a""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 3dad80776d7f4e15b9869fedfbaa4bbe), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.