(1): Job J9P3122 Route I-55 CAPE GIRARDEAU County. Grading, paving, drainage, guardrail and 3 bridge rehabilitations over BNSF Railway and Route 74 and Route 61 over I-55 and at Route 61 and Silver Springs Road, the total length of improvement being 1.849 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes grading, paving, drainage, guardrail, and 3 bridge rehabilitations over BNSF Railway and Route 74 and Route 61 over I-55 and at Route 61 and Silver Springs Road, the total length of improvement being 1.849 miles. The itemized bid includes roadway items such as removal of improvements, class A excavation, compacting embankment, class 3 excavation, linear grading, shaping slopes, rock base material, aggregate base, asphaltic concrete mixture, concrete pavement, curb and gutter, rock ditch liner, impact attenuators, pavement markings, temporary traffic control, mobilization, guardrail, high-tension guard cable, lighting poles and luminaries, signing, and bridge deck repairs including scarification, hydro demolition, latex modified concrete wearing surface, and reinforcing steel.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-H01), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.