(1): Job JST0017C Route B COOPER County. Roundabout and ADA improvements at Americana Drive near Booneville, the total length of improvement being 0.112 miles.
Bid opening: 10/16/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes removal of improvements, unclassified excavation, compacting embankment, compacting in cut, class 3 excavation, aggregate base, bituminous pavement mixture, concrete pavement, concrete curb ramp, truncated domes, paved approach, concrete sidewalk, tinted concrete median strips, concrete curb, integral curb, rock lining, dry curb, manhole frame and cover, construction signs, relocated signs, channelizers, barricades, changeable message sign, mobilization, additional mobilization for seeding, pavement markings (thermoplastic, paint, tape, removal), temporary pavement marking paint, contractor furnished surveying and staking, pipe group A, precast concrete drop inlet, flared end sections, mulching, turf type tall fescue sodding, sediment trap excavation and rock, alternate ditch check, curb inlet check, temporary seeding, silt fence, erosion control blanket, conduit, pull box, concrete footings, pipe posts, breakaway assembly, PSST posts, driven and concrete post anchors, flat sheet signs, and fluorescent flat sheet signs.
We post new roofing opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261016-D14), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.