(1): Job JCD0229 Route T MONITEAU County. Bridge rehabilitation over Burris Fork, the total length of improvement being 0.09 miles.
(2): Job JCD0302 Route 87 MONITEAU County. Bridge rehabilitation over Moreau Creek, the total length of improvement being 0.279 miles.
Bid opening: 10/16/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes bridge rehabilitation on two bridges: Job JCD0229 on Route T over Burris Fork (0.09 miles) and Job JCD0302 on Route 87 over Moreau Creek (0.279 miles). Work items include removal of improvements, shaping slopes, construction signs, guardrail, bridge approach transition sections, crashworthy end terminals, removal of existing expansion joints, concrete repairs, substructure repairs, reinforcing steel, pavement marking paint, epoxy polymer wearing surface, protective coating, surface preparation and recoating of structural steel, and steel repairs.
We post new roofing opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261016-D06), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.