Bridge rehabilitation including concrete deck patching, extension of steel pile encasements, substructure repairs, replacement of expansion joints, structural steel repair and beam end trimming, partial painting, temporary supports, slope repair, guardrail and approach work and on M-77 over the Manistique River, Schoolcraft County.
In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Fa and N4. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Proposals and plans: http://mdotcf.state.mi.us/public/eprop/login/index.cfm
Bridge rehabilitation including concrete deck patching, extension of steel pile encasements, substructure repairs, replacement of expansion joints, structural steel repair and beam end trimming, partial painting, temporary supports, slope repair, guardrail and approach work on M-77 over the Manistique River, Schoolcraft County.
We post new structural work opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan Department of Transportation (solicitation 261204-020), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.