1.37 mi of hot mix asphalt reconstruction, 2.77 mi of hot mix asphalt cold milling and overlay, partial deck replacement, deck patching, epoxy overlay, expansion joint replacement, substructure patching, silane treatment, epoxy injecting box beams, barrier patching, downspout installation, scour countermeasure, full depth pavement repairs, storm sewer, concrete curb and gutter, driveway and sidewalk, signing, signals, lighting, guardrail, underdrain and pavement markings on M-150 from Tienken Road southerly to Paint Creek and M-150 from Clinton River southerly to M-59 in the city of Rochester Hills, Oakland County. This project includes two 5 year materials and workmanship pavement warranties, a 2 year concrete surface coating warranty, and a 5 year pavement performance warranty.
In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Proposals and plans: http://mdotcf.state.mi.us/public/eprop/login/index.cfm
The work includes 1.37 miles of hot mix asphalt reconstruction and 2.77 miles of hot mix asphalt cold milling and overlay, partial deck replacement, deck patching, epoxy overlay, expansion joint replacement, substructure patching, silane treatment, epoxy injecting box beams, barrier patching, downspout installation, scour countermeasure, full depth pavement repairs, storm sewer, concrete curb and gutter, driveway and sidewalk, signing, signals, lighting, guardrail, underdrain and pavement markings on M-150 from Tienken Road southerly to Paint Creek and M-150 from Clinton River southerly to M-59, with two 5 year materials and workmanship pavement warranties, a 2 year concrete surface coating warranty and a 5 year pavement performance warranty.
We post new asphalt opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan Department of Transportation (solicitation 261106-012), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.