As a result of required maintenance inspections, the following were observed
to have deficiencies:
♦ Sunnyslope Ave Pedestrian Bridge
♦ Coldwater Cyn & Burbank Blvd Bridge
♦ Doman AvePedestrian Bridge.
The project will repair these deficiencies. Repairs include:
♦♦ concrete spalls
♦♦ cracks
♦♦ asphalt patching
♦♦ bridge railings
♦♦ timber bridge decks
♦♦ Any other incidental work required for the proper execution & completion of the job.
This project is intended to restore the original functionality of the bridges & prevent further deterioration that could lead to future structural deficiencies.
Note: The project scope has changed since the original bid
♦ See bid package for full scope & details
♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder
♦ For Bid Results visit http://engineering.lacity.gov/contractors/
Repairs at the Sunnyslope Ave Pedestrian Bridge, Coldwater Cyn & Burbank Blvd Bridge, and Doman Ave Pedestrian Bridge include concrete spalls, cracks, asphalt patching, bridge railings, timber bridge decks, and any other incidental work required for proper execution and completion to restore original functionality and prevent further deterioration.
We post new concrete opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Los Angeles RAMP (bid 232713), retrieved via the City of Los Angeles. View the official posting, and always confirm requirements and deadlines with the issuing agency.