Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the
entirety of the tank, and replace the audible and visual alarms.
o Fix the remote containment basin drainage issue.
o Replace the asphalt on the NE side of the fueling facility.
o Repair the refueler parking concrete.
o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump.
o Replace the asphalt near the loading/unloading facility with a concrete path.
o Replace POL building of the same size and at the same location.
o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS.
o Relocate the generator that is inside the compartmentalized area.
The work includes installing a sampling gauge hatch and clock type mechanical gauge on a manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk across the tank, and replacing audible and visual alarms. It also includes fixing the remote containment basin drainage issue, replacing asphalt on the NE side of the fueling facility, repairing refueler parking concrete, replacing the dispenser fuel monitor with a non-coalescing filter and installing a water draw off system with a hand pump, replacing asphalt near the loading/unloading facility with a concrete path, replacing the POL building of the same size and at the same location, completing supplying, installation, and testing of an ATG system on a Fuel Storage Tank (AVGAS), and relocating the generator inside the compartmentalized area. Optional work includes stockpiling and disposal of petroleum contaminated soil, handling and disposal of lead-based paint and paint containing chromium, and handling and disposal of asbestos containing material.
We post new asphalt opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"68102-4901""OMAHA""NE""USA""KO CONTRACTING OFFICE""1616 CAPITOL AVENUE""Solicitation - W9128F27RA045.pdf"7643970"file"".pdf""1""2026-10-22T20:53:15.397+00:00""65ec200884e8407e9a01ee4505e16825""public""0""public""fca8613e7e8f4730b8840463479ad661""0"25"0""27-R-A045-Specs.pdf"7926748"file"".pdf""1""2026-10-22T20:53:15.397+00:00""b4b1193e2c024a61baab6283d52a2237""public""0""public""2bed9d710af24dc682dab747b89854cc""0"20"0""Davis Bacon Wage Determinations - CA20260007.pdf"238147"file"".pdf""1""2026-10-22T20:53:15.397+00:00""7a86d8d9e872489a8e5c44069fc909b4""public""0""public""5bda05894bf44dd897425245bad343ee""0"16"0""Mather Selection Criteria - Rev 1.pdf"307579"file"".pdf""1""2026-10-23T15:37:35.891+00:00""1303c38fff5e4dcf9b960d4d820935ee""public""2026-10-23T16:19:37.901+00:00""1""public""40676fe070904283ae23aa723335350d""0"13"0""2026-10-23T16:19:37.901+00:00""Mather Selection Criteria - Rev 2.pdf"267051"file"".pdf""1""2026-10-23T16:19:37.901+00:00""cf207897648a466195586238ffd164bd""public""0""public""a3a8b45c35df405fa3fa3c7cbe4e460c""0"12"0""RFP Drawings.pdf"3157785"file"".pdf""1""2026-10-22T20:53:15.397+00:00""af544e5a711e41eca684398da99fe2d4""public""0""public""e6d4e9ef8dfe45c3a3d515f3ef3b1744""0"11"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 749571a8773e4c51bf2d53495be7c41d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.