clearing and grubbing, removal of bridge, grading, drainage structures, class ii base course, pavement patching, milling asphalt concrete, asphalt concrete pavement, swing span bridge, permanent sheeting (steel), precast concrete piles, treated timber piles, bridge operator house, and related work.
Route(s): LA 56
Parish: Terrebonne
Federal Number: H002244
Estimated Construction Cost: $50,000,000 to $70,000,000
OJT Goal: 12 Trainees
Specbook: 2026
Letting: 10/14/2026 Headquarters — electronic bids via www.bidx.com, downloaded 10:00 a.m.
09/17/2026 - Added to the letting of October 14, 2026. SPECIAL NOTICE TO CONTRACTORS: Bidders are required to certify their intent to comply with Section 102.14 of the 2026 Louisiana Standard Specifications for Roads and Bridges.
Schedule of items (128 pay items, quantities for information only):
0001 · 201-01-00100 · Clearing and Grubbing (Approximate Total Area: 3.88 Acres) · LUMP · 1
0002 · 202-01-00100 · Removal of Structures and Obstructions · LUMP · 1
0003 · 202-02-00050 · Removal of Waterline (6" Asbestos Cement) · LUMP · 1
0004 · 202-02-00050 · Removal of Waterline (8" Asbestos Cement) · LUMP · 1
0005 · 202-02-02000 · Removal of Asphalt Drives · SQYD · 91
0006 · 202-02-03030 · Removal of Pavement Structure · SQYD · 5,738
0007 · 202-02-04501 · Removal of Bridge (STA 29.7 FT X 284 FT SWINGSPAN BRIDGE) · LUMP · 1
0008 · 202-02-06100 · Removal of Concrete Walks and Drives · SQYD · 167
0009 · 202-02-12300 · Removal of Fender System · EACH · 2
0010 · 202-02-14500 · Removal of Guard Rail · LNFT · 356.8
0011 · 202-02-30000 · Removal of Operators House · EACH · 1
0012 · 202-02-38240 · Removal of Signs and Supports · EACH · 24
0013 · 202-03-38000 · Relocation of Sign · EACH · 2
0014 · 203-01-00100 · General Excavation · CUYD · 3,283
0015 · 203-03-00100 · Embankment · CUYD · 3,111
0016 · 203-04-00300 · Nonplastic Embankment (Stone) · CUYD · 3,461
0017 · 203-08-00100 · Geotextile Fabric · SQYD · 4,787
0018 · 203-10-00100 · Cleaning Existing Ditches · LNFT · 370
0019 · 203-11-00100 · Settlement Plate Installation and Monitoring · EACH · 9
0020 · 204-05-00100 · Temporary Sediment Check Dams (Hay) · EACH · 10
0021 · 204-06-00100 · Temporary Silt Fencing · LNFT · 5,945
0022 · 302-02-12070 · Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) · SQYD · 3,031.8
0023 · 401-02-00100 · Aggregate Surface Course (Adjusted Vehicular Measurement) · CUYD · 233
0024 · 402-01-00101 · Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) · CUYD · 11.6
0025 · 502-01-00100…
The work consists of clearing and grubbing, removal of the existing swing span bridge, grading, drainage structures, class II base course, pavement patching, milling asphalt concrete, asphalt concrete pavement, construction of a new swing span bridge, permanent steel sheeting, precast concrete piles, treated timber piles, a bridge operator house, and related work. The schedule includes 128 pay items covering items such as removal of structures, excavation, embankment, geotextile fabric, storm drain pipe, guard rail, concrete work, structural metalwork, and electrical systems for the movable bridge.
We post new asphalt opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Louisiana work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Louisiana Department of Transportation and Development (solicitation H.002244.6), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.