Solar Highway Lighting - FEDERAL
Category: TRF. Type: Request for Bids (RFB). Agency: Transportation - Office Of The Secretary. Documents: How to Submit an Online Response - March 2023.pdf; Final_RFB_605_2700000197_1_SO_FORM.PDF — Assembled pdf file for document [RFB,605,2700000197,1] - Solicitation Printer; Final_RFB_605_2700000197_2_SO_FORM.PDF — Assembled pdf file for document [RFB,605,2700000197,2] - Solicitation Printer; Final_RFB_605_2700000197_3_SO_FORM.PDF — Assembled pdf file for document [RFB,605,2700000197,3] - Solicitation Printer; Final_RFB_605_2700000197_4_SO_FORM.PDF — Assembled pdf file for document [RFB,605,2700000197,4] - Solicitation Printer; Final_RFB_605_2700000197_5_SO_FORM.PDF — Assembled pdf file for document [RFB,605,2700000197,5] - Solicitation Printer
The contractor shall supply and install solar-powered highway lighting systems across Kentucky. Work includes providing pre-engineered lighting retrofit packages in three quantity tiers (10 or less, 11-29, 30-200 units) with widespread optics and 4000K color temperature. Contractor must supply 20-foot and 25-foot poles with 6-foot arms in matching quantity tiers, plus decorative head options for 25-foot poles and commercial twin-arm configurations. Installation services encompass direct burial pole placement with excavation, backfilling, compaction, component assembly, fixture securement, system testing and commissioning, and final adjustments. Anchor base installation includes foundation excavation, anchor-bolt cage installation, concrete pouring and curing, pole mounting, component assembly, testing, and site cleaning. Contractor shall provide remote monitoring system compatible with KYTC's Fonroche Connect platform (or equivalent with no annual fees), site visit and technical audit, equipment delivery and staging, post-installation inspection, and comprehensive photometric design and calculations including AGI files and light spread drawings. Technician support covers custom design development, structural analysis, detailed fabrication drawings, and third-party review with stamped documentation. All materials must be delivered to KYTC facilities within Kentucky or within 25 miles of state borders.
We post new electrical opportunities in Kentucky as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Kentucky work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Transportation - Office Of The Secretary (solicitation RFB-605-2700000197-5), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.