The Virginia General Assembly established the Solar Interconnection Grant Program through Senate Bill 659 and House Bill 683 (2026) to address one of the barriers facing public-sector solar development: the cost of interconnecting distributed solar energy systems to the electric grid. While the cost of solar equipment has declined substantially over the past decade, interconnection costs, including utility-required system upgrades, protection equipment, engineering studies, and other infrastructure improvements, have become an increasingly important factor affecting project feasibility.
The program is intended to help offset interconnection costs, including utility-required system upgrades, protection equipment, engineering studies and other infrastructure improvements, enabling public bodies to pursue solar projects that reduce energy expenditures and increase deployment of clean energy across the Commonwealth.
We post new electrical opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
["https://procure.cgieva.com/page.aspx/en/fil/download_public/9F9EE114-E34E-4FAD-828C-0179FBC8EEA3"]["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/9F9EE114-E34E-4FAD-828C-0179FBC8EEA3\"\">Solar Interconnection Grant Program Guidelines -Repost (1).pdf</a>"]["9F9EE114-E34E-4FAD-828C-0179FBC8EEA3"]["Solar Interconnection Grant Program Guidelines -Repost (1).pdf"]["521452"]["11/15/26"]["Solar Interconnection Grant Guidelines"]["RFx Document"]Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Virginia eVA (solicitation IV131767), retrieved via Virginia's eVA statewide eProcurement marketplace. View the official posting, and always confirm requirements and deadlines with the issuing agency.