The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for replacement of two existing Reznor heaters (heating, cooling, and controls) at the Iowa Correctional Institution for Women (ICIW) Iowa Prison Industries (IPI) Building at 420 Mill Street SW, Mitchellville, IA.
Design services include all design disciplines necessary to complete the scope of work, field examination of existing buildings, creation of all drawings, design for building heating, cooling, controls, electrical for new heating/cooling units, exhaust, building air supply/louvers, equipment pads, and ductwork. The designer must attend a design kick-off meeting, coordinate with the Construction Manager, provide construction administration including submittal review, RFI responses, change orders, pay applications, periodic site visits, and closeout documentation. The designer must also assist in obtaining bids, provide cost opinions at various design phases, and comply with all federal, state, and applicable AHJ codes.
We post new hvac opportunities in Iowa as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Iowa work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Iowa DAS Procurement (bid RFP955100-01), retrieved via Iowa Department of Administrative Services. View the official posting, and always confirm requirements and deadlines with the issuing agency.