11 miles of resurfacing on IL 140 from the Madison County line to IL 127 west junction.
Item: 111
Contract: 76L27
Region/District: 5 / 8
DBE goal: Pending%
VBP goal: Pending%
Federal Project: STPEQJS(154)
Key Routes: FAP 785
Marked Routes: IL 140
Sections: (137-2,138,139)RS-2
State Jobs: C-98-175-18
Contract specifics:
The work includes excavating and grading existing shoulders, applying bituminous tack coat and longitudinal joint sealant, placing hot-mix asphalt binder and surface courses, removing existing hot-mix asphalt surface, installing class B patches, dowel bars and tie bars, constructing aggregate wedge and hot-mix asphalt shoulders, installing and removing steel plate beam guardrail and traffic barrier terminals, installing shoulder and sinusoidal rumble strips, providing an engineer's field office and mobilization, implementing traffic control and protection measures including changeable message signs and surveillance, and installing temporary and thermoplastic pavement markings along with raised reflective pavement markers and their removal.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 76L27), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.