11.97 miles of Cold in Place Recycling, Cold Milling, and HMA resurfacing on IL 26 from US 30 to Bureau County Line.
Item: 046
Contract: 64S80
Region/District: 2 / 2
DBE goal: Pending%
VBP goal: Pending%
Federal Project: NHPPPXF2(326)
Key Routes: FAP 316
Marked Routes: IL 26
Sections: (101,102,114)RS
State Jobs: C-92-097-24
Contract specifics:
Work includes full-depth cold in-place recycling at 4.0 inches (181,237 sq yd), variable-depth hot-mix asphalt removal (181,237 sq yd), and placement of hot-mix asphalt binder course (14,965 tons) and surface course (16,790 tons). Incidental work includes earth excavation, topsoil furnish and placement, aggregate subgrade improvement, polymerized bituminous tack coat, longitudinal joint sealant, material transfer device placement, temporary ramps, aggregate wedge shoulders, concrete curb, steel plate beam guardrail and weak post guardrail installation and removal, traffic barrier terminals, delineators, permanent survey markers, engineer's field office, mobilization, traffic control and protection, changeable message signs, short-term and permanent pavement marking (including modified urethane marking and grooving for recessed marking), sign panels and supports, and barrier wall and guardrail reflectors.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 64S80), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.