HMA resurfacing, patching, pavement markings, sidewalks and ADA improvements at various locations in the city of Elgin.
Item: 024
Contract: 61K73
Region/District: 1 / 1
DBE goal: Pending%
VBP goal: Pending%
Federal Project: J60Q(786)
Key Routes: VARIOUS
Sections: 24-00206-00-RS (ELGIN)
State Jobs: C-91-197-24
Contract specifics:
The work includes HMA resurfacing, patching, pavement markings, sidewalks and ADA improvements. Specific pay items include tree trunk protection, tree root pruning, earth excavation, topsoil furnish and place, sodding, supplemental watering, temporary erosion control seeding, inlet filters, subbase granular material, bituminous materials (tack coat), longitudinal joint sealant, mixture for cracks/joints/flangeways, hot-mix asphalt surface removal, hot-mix asphalt binder course IL-9.5 N70, hot-mix asphalt surface course IL-9.5 Mix D N70, portland cement concrete driveway pavement 7 inch, portland cement concrete sidewalk 5 inch and 7 inch, detectable warnings, hot-mix asphalt surface removal 3 inch, driveway pavement removal, sidewalk removal, class D patches of various types and depths, inlets to be adjusted, mobilization, traffic control and protection, changeable message sign, short term pavement marking and removal, sign panel, metal post, thermoplastic pavement marking (letters/symbols and lines of various widths), washout basin, remove and reinstall brick paver, curb wall (special), portland cement concrete sidewalk 5 inch (special), combination curb and gutter removal and replacement, frames and lids to be adjusted (special), pavement marking (special), construction layout, and temporary information signing.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 61K73), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.