HMA resurfacing of Crystal Lake Rd. from Algonquin Rd. to Miller Rd. in the village of Lake in the Hills. Additional work includes pavement patching, drainage improvements, sidewalks, ADA improvements and other required work.
Item: 038
Contract: 61M88
Region/District: 1 / 1
DBE goal: Pending%
VBP goal: Pending%
Federal Project: MMXM(446)
Key Routes: FAU 4038
Marked Routes: CRYSTAL LAKE ROAD
Sections: 23-00045-00-RS
State Jobs: C-91-317-26
Contract specifics:
The work includes HMA resurfacing, pavement patching, drainage improvements, sidewalks, ADA improvements, tree trunk protection, tree root pruning, removal and disposal of unsuitable material, furnished excavation, trench backfill, geotechnical fabric for ground stabilization, topsoil furnish and place, sodding, supplemental watering, inlet filters, aggregate subgrade improvement, aggregate base course, bituminous materials (tack coat), longitudinal joint sealant, mixture for cracks/joints/flangeways, hot-mix asphalt surface removal, polymerized hot-mix asphalt binder course, hot-mix asphalt surface course, detectable warnings, pavement removal, driveway pavement removal, combination curb and gutter removal, sidewalk removal, class D patches, protective coat, storm sewers, catch basins, valve boxes to be adjusted, frames and grates, frames and lids, removing inlets, non-special waste disposal, soil disposal analysis, regulated substances pre-construction plan, regulated substances final construction report, regulated substances monitoring, mobilization, traffic control and protection, short term pavement marking, short term pavement marking removal, temporary pavement marking, sign panel, remove sign panel assembly, remove and relocate sign panel assembly, telescoping steel sign support, thermoplastic pavement marking, temporary access, portland cement concrete driveway pavement, portland cement concrete sidewalk, frames and lids to be adjusted, combination concrete curb and gutter, temporary information signing, hot-mix asphalt driveway removal and replacement, construction layout, drainage & utility structures to be adjusted, and drainage & utility structures to be reconstructed.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 61M88), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.