Construction of a three-span PPC IL Beam bridge carrying Harmony Road over Coon Creek in McHenry County. Additional work includes full-depth HMA pavement, pavement markings, drainage improvements, retaining wall and other required work.
Item: 032
Contract: 61M72
Region/District: 1 / 1
DBE goal: Pending%
VBP goal: Pending%
Federal Project: V417(027)
Key Routes: FAS 1019
Marked Routes: HARMONY ROAD
Sections: 19-00509-00-BR
State Jobs: C-91-069-20
Contract specifics:
Construct a three-span PPC IL Beam bridge on Harmony Road over Coon Creek with concrete structures, superstructure and approach slabs, precast prestressed beams, reinforcement bars, steel piles, drilled shafts, bearings and steel railing; build full-depth HMA pavement with aggregate subgrade and base, binder and surface courses, curb and gutter and pavement markings; install storm sewers, pipe culverts, underdrains, catch basins and outfall structure; build soldier-pile retaining wall with timber lagging, guardrail and terminals, riprap, articulated block revetment mat, seeding and erosion control; and provide mobilization, construction layout, traffic control and protection, and engineer's field office.
We post new structural work opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 61M72), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.