2.7 miles of reconstruction, bridge replacement, interchange reconstruction, lighting, and culvert replacement at the IL 5/I-74 interchange and extending on IL 5 from 16th St to 0.1 miles west of 38th St in Moline and on I-74 from 0.9 miles south of 23rd Ave in Moline to 0.5 miles south of IL 5.
Item: 042
Contract: 64H87
Region/District: 2 / 2
DBE goal: Pending%
VBP goal: Pending%
Federal Project: NHPPQHCK(407)
Key Routes: FAI 74, FAP 595
Marked Routes: I-74 & IL 5
Sections: (81-2)R&142-1
State Jobs: C-92-171-24
Contract specifics:
The work includes 2.7 miles of reconstruction, bridge replacement, interchange reconstruction, lighting, and culvert replacement at the IL 5/I-74 interchange and extending on IL 5 from 16th St to 0.1 miles west of 38th St in Moline and on I-74 from 0.9 miles south of 23rd Ave in Moline to 0.5 miles south of IL 5. The pay items list includes tree removal, earth excavation, removal and disposal of unsuitable material, furnished excavation, porous granular embankment, trench backfill, topsoil excavation and placement, seeding, fertilization, mowing, mulch, turf reinforcement mat, temporary erosion control, stone riprap, filter fabric, aggregate subgrade improvement, subbase granular material, stabilized subbase, pavement connector, portland cement concrete pavement, protective coat, sidewalk, detectable warnings, pavement removal, driveway pavement removal, curb and gutter removal, sidewalk removal, paved ditch removal, paved shoulder removal, aggregate shoulders, portland cement concrete shoulders, removal of existing structures, concrete removal, concrete headwall removal, pipe culvert removal, protective shield, structure excavation, rock excavation for structures, concrete structures, concrete superstructure, protective coat, concrete superstructure (approach slab), furnishing and erecting precast prestressed concrete beams, erecting structural steel, stud shear connectors, reinforcement bars, bar splicers, bicycle railing, parapet railing, slope wall, furnishing steel piles, driving piles, test piles, drilling and setting piles, name plates, permanent casing, drilled shaft, preformed joint seal, erecting elastomeric bearing assembly, anchor bolts, temporary soil retention system, box culvert end sections, precast concrete box culverts, precast reinforced concrete flared end sections, pipe culverts, insertion culvert liner, storm sewers, storm sewer removal, storm sewers jacked in place, water valves to be adjusted, granular backfill for structures, concrete sealer, geocomposite wall drain, concrete headwalls for pipe drains, french drains, geotechnical fabric for french drains, pipe underdrains, manholes, inlets to be adjusted, drainage structures, removing catch basins, removing inlets, class SI concrete (outlet), concrete curb, combination concrete curb and gutter, concrete median surface, concrete median, box culverts to be cleaned, pipe culverts to be cleaned, steel plate beam guardrail, long-span guardrail over culvert, traffic barrier terminal, guardrail removal, high tension cable median barrier removal, delineators, concrete barrier, concrete barrier transition, concrete barrier base, shoulder rumble strips, impact attenuators, chain link fence, non-special waste disposal, special waste groundwater disposal, soil disposal analysis, regulated substances pre-construction plan, regulated substances final construction report, regulated substances monitoring, mobilization, traffic control and protection, traffic control surveillance, changeable message sign, temporary pavement marking, temporary concrete barrier, pinning temporary concrete barrier, relocate temporary concrete barrier, impact attenuators temporary, sign panels, remove sign panels, terminal marker, structural steel sign support, telescoping steel sign support, wood sign support, base for telescoping steel sign support, overhead sign structure, concrete foundations, drilled shaft concrete foundations, remove overhead sign structure, remove ground mounted sign support, remove concrete foundation, remove overhead sign structure walkway, preformed plastic pavement marking, modified urethane pavement marking, grooving for recessed pavement marking, raised reflective pavement marker, temporary raised reflective pavement marker, pavement marking removal, electric service installation, service installation, underground conduit, conduit attached to structure, conduit embedded in structure, junction box, handhole, heavy-duty handhole, double handhole, unit duct, elec…
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 64H87), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.