- County
- POTTAWATTAMIE
- Bid Order
- 019
- Enriched
- Yes
- Projects
- HDP-C078(210)--6B-78
- Proposal Id
- 78-C078-210
- Letting Date
- Dec 15, 2026
- List Url Hint
- ia.iowadot.gov/contracts/biddocuments
- Package Text
- 11/10/2026 11:14 AM
CONTRACTS AND SPECIFICATIONS BUREAU
Proposal
Proposal ID: 78-C078-210 Letting Date: December 15, 2026
Call Order: 019
Proposal Work Type: BRIDGE REPLACEMENT - PPCB
DBE Goal: 0.0%
Contracting Authority: POTTAWATTAMIE CO
Proposal Guaranty: $375,000.00
This proposal includes the following project(s):
Project Number: HDP-C078(210)--6B-78 County: POTTAWATTAMIE
Project Work Type: BRIDGE REPLACEMENT - PPCB Route: MAGNOLIA RD
Location: On MAGNOLIA RD, Over Mosquito Creek, from 260TH E 1 mile
Road System: FARM TO MARKET ROAD
Federal Aid - Wages: Federal Aid - Predetermined Wages are in Effect
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Contract Time
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
Site ID Site Details Liquidated
Damages
00 Late Start Date 04/05/2027 215 WORK DAYS $2,000.00
Overall Site.
01 No Start Date Specified 16 CALENDAR DAYS $10,500.00
Closure of I-80 WB ramps. See description below.
02 No Start Date Specified 16 CALENDAR DAYS $10,500.00
Closure of I-80 EB ramps. See description below.
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
Notes
Notes :
***Site01***
This is an incentive/ disincentive restricted site for a critical closure activity. Section 1111 of the Standard
Specifications for Incentive/Disincentive (I/D) shall apply.
Incentive/Disincentive/Liquidated Damages per Day: $10,500
Maximum Incentive: $52,500
The Critical Closure Activity is as follows:
Closure of I-80 WB ramps, site is complete when these ramps are open with no further closures to these
ramps.
***Site02***
This is an incentive/ disincentive restricted site for a critical closure activity. Section 1111 of the Standard
Specifications for Incentive/Disincentive (I/D) shall apply.
Incentive/Disincentive/Liquidated Damages per Day: $10,500
Maximum Incentive: $52,500
The Critical Closure Activity is as follows:
Closure of I-80 EB ramps, site is complete when these ramps are open with no further closures to these
ramps.
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Specifications List
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
Note Description
001.2023 *** STANDARD SPECIFICATIONS -- SERIES 2023 ***
The Iowa Department of Transportation STANDARD SPECIFICATIONS FOR
HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2023, plus applicable General
Supplemental Specifications, Developmental Specifications, Supplemental
Specifications AND Special Provisions shall apply to construction work on this contract.
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Specifications List
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
Note Description
005.1107.02 *** Revisions to Article 1107.02 ***
Article 1107.02, Insurance, is amended by the following modifications and additions.
This proposal note becomes null and void January 1, 2027.
A. It shall be the Contractor's responsibility to have liability insurance covering all
of the construction operations incident to contract completion and the Contractor must
have on file with the Contracting Authority a current "Certificate of Insurance" prior to
award of contract. The certificate shall identify the insurance company firm name and
address, Contractor firm name, policy period, type of policy, limits of coverage, and
scope of work covered (single contract or statewide). This requirement shall apply with
equal force, whether the work is performed by persons employed directly by the
Contractor including a subcontractor, persons employed by a subcontractor, or by an
independent contractor.
B. In addition to the above, the Contracting Authority shall be included as an
insured party, or a separate owner's protective policy shall be filed showing the
Contracting Authority as an insured party.
C. The liability insurance shall be written by an insurance company (or
companies) qualified to do business in Iowa. For independent contractors engaged
solely in the transportation of materials, the minimum coverage provided by such
insurance shall be not less than that required by Chapter 325A, Code of Iowa, for such
truck operators or contract carriers as defined therein. For all other contractors,
subcontractors, independent contractors, and the Contracting Authority, the minimum
coverage by such insurance shall be as follows:
General Liability, Including: BODILY INJURY
Independent Contractors $500,000 Each Occurrence
Contractual Liability, $500,000 Aggregate
Products and Completed PROPERTY DAMAGE
Operations $250,000 Each Occurrence
$250,000 Aggregate
or
BODILY INJURY AND PROPERTY DAMAGE
- COMBINED SINGLE LIMIT*
$750,000 Each Occurrence
$750,000 Aggregate
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Specifications List
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
Note Description
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
D. Failure on the part of the Contractor to comply with the requirements of this
article will be considered sufficient cause to suspend the work, withhold estimates, and
to deny the Contractor from receiving further contract awards, as provided in Article
1103.01.
500.01 *** WINTER WORK ***
The free time allowed between November 15 and April 1 will not be permitted on this
project. The Contractor shall work during the winter on all working days as defined in
Article 1101.03 'Working Day'.
DS-23057 DEVELOPMENTAL SPECIFICATIONS FOR WORK ON RAILROAD RIGHT-OF-WAY
(BNSF RAILWAY)
DS-23083 DEVELOPMENTAL SPECIFICATIONS FOR FIBER REINFORCEMENT FOR
STRUCTURAL CONCRETE
FHWA-1273.09 FHWA-1273: REQUIRED CONTRACT PROVISIONS FEDERAL-AID
CONSTRUCTION CONTRACTS -- REVISED OCTOBER 23, 2023
23 U.S.C. 133(i) requires application of Davis Bacon predetermined wages on certain
projects on roads functionally classified as a local road or a rural minor collector. This
supersedes the applicability described in FHWA-1273 Section IV.
GS-23007 GENERAL SUPPLEMENTAL SPECIFICATIONS FOR HIGHWAY AND BRIDGE
CONSTRUCTION, OCTOBER 20, 2026 RELEASE
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Specifications List
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
Note Description
IA26-28.4A PREDETERMINED WAGE RATE - GENERAL DECISION NUMBER IA20260028
FOR HEAVY AND HIGHWAY CONSTRUCTION -- STATEWIDE (EXCEPT SCOTT
COUNTY)
Note: The Contractor shall review the contract documents and
is responsible for identifying which zone(s), as defined
in the Predetermined Wage Rate specification, apply to
the work on the contract.
*** Additional Requirement ***
Contracts where the Department is the Contracting Authority:
The Prime Contractor and each approved Subcontractor shall submit certified payrolls
weekly to the Project Engineer. Each Contractor shall use the AASHTOWare Project
Civil Rights and Labor (AWP CRL) software to electronically submit Certified Payroll
Reports. The Contractor shall list the craft for each employee covered by the
Predetermined Wage Rates. The Prime Contractor shall review and approve each
Subcontractor’s payroll within AWP CRL.
Contracts where the Department is not the Contracting Authority:
The Prime Contractor shall submit certified payrolls for itself and each approved
Subcontractor weekly to the Project Engineer. The Contractor may use the Iowa D.O.T.
Certified Payroll form or other approved form. The Contractor shall list the craft for
each employee covered by the Predetermined Wage Rates. The Prime Contractor
shall sign each of the Subcontractor's payrolls to acknowledge the submittal of the
Certified Payroll.
SS-23009 SUPPLEMENTAL SPECIFICATIONS FOR HOT MIX ASPHALT INTERLAYER
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0010 2101-0850001 0.100
CLEARING AND GRUBBING ACRE _________._____ _________._____
0020 2101-0850002 169.400
CLEARING AND GRUBBING UNIT _________._____ _________._____
0030 2102-2625000 7,430.000
EMBANKMENT-IN-PLACE CY _________._____ _________._____
0040 2102-2710070 8,728.000
EXCAVATION, CLASS 10, ROADWAY
AND BORROW
CY _________._____ _________._____
0050 2102-2710080 1,000.000
EXCAVATION, CLASS 10, UNSUITABLE
OR UNSTABLE MATERIAL
CY _________._____ _________._____
0060 2102-5020010 7.860
OBLITERATE OLD ROADBED STA _________._____ _________._____
0070 2104-2710020 1,271.000
EXCAVATION, CLASS 10, CHANNEL CY _________._____ _________._____
0080 2105-8425015 5,492.000
TOPSOIL, STRIP, SALVAGE AND
SPREAD
CY _________._____ _________._____
0090 2109-8225100 41.700
SPECIAL COMPACTION OF
SUBGRADE
STA _________._____ _________._____
0100 2115-0100000 2,296.000
MODIFIED SUBBASE CY _________._____ _________._____
0110 2121-7425010 2,548.000
GRANULAR SHOULDERS, TYPE A TON _________._____ _________._____
0120 2122-5190007 320.400
PAVED SHOULDER, P.C. CONCRETE,
7 IN.
SY _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0130 2122-5190008 646.100
PAVED SHOULDER, P.C. CONCRETE,
8 IN.
SY _________._____ _________._____
0140 2123-7450020 52.030
SHOULDER FINISHING, EARTH STA _________._____ _________._____
0150 2301-0690201 845.200
BRIDGE APPROACH, BR-201 SY _________._____ _________._____
0160 2301-1033080 11,989.900
STANDARD OR SLIP FORM
PORTLAND CEMENT CONCRETE
PAVEMENT, CLASS C, CLASS 3
DURABILITY, 8 IN.
SY _________._____ _________._____
0170 2301-6911722
PORTLAND CEMENT CONCRETE
PAVEMENT SAMPLES
LUMP SUM LUMP SUM _________._____
0180 2301-9091000 2.000
RUMBLE STRIP PANEL (PCC
SURFACE)
EACH _________._____ _________._____
0190 2304-0101000 899.300
TEMPORARY PAVEMENT SY _________._____ _________._____
0200 2312-8260051 1,311.000
GRANULAR SURFACING ON ROAD,
CLASS A CRUSHED STONE
TON _________._____ _________._____
0210 2315-8275025 477.000
SURFACING, DRIVEWAY, CLASS A
CRUSHED STONE
TON _________._____ _________._____
0220 2401-6745355 2.000
REMOVAL OF CONCRETE FOOTINGS
OF HIGHWAY SIGNS
EACH _________._____ _________._____
0230 2401-6745625
REMOVAL OF EXISTING BRIDGE LUMP SUM LUMP SUM _________._____
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0240 2402-2720000 850.200
EXCAVATION, CLASS 20 CY _________._____ _________._____
0250 2402-2720100 105.000
EXCAVATION, CLASS 20, FOR
ROADWAY PIPE CULVERT
CY _________._____ _________._____
0260 2402-2721000 599.000
EXCAVATION, CLASS 21 CY _________._____ _________._____
0270 2403-0100010 1,064.500
STRUCTURAL CONCRETE (BRIDGE) CY _________._____ _________._____
0280 2403-1000005 417.500
FIBER REINFORCEMENT FOR
STRUCTURAL CONCRETE
CY _________._____ _________._____
0290 2403-1000010
TRIAL BATCH AND TEST PLACEMENT
(FIBER REINFORCED CONCRETE)
LUMP SUM LUMP SUM _________._____
0300 2404-7775000 81,037.000
REINFORCING STEEL LB _________._____ _________._____
0310 2404-7775005 103,054.000
REINFORCING STEEL, EPOXY
COATED
LB _________._____ _________._____
0320 2404-7775009 3,108.000
REINFORCING STEEL, STAINLESS
STEEL
LB _________._____ _________._____
0330 2407-0562840 18.000
BEAMS, PRETENSIONED
PRESTRESSED CONCRETE, BTB40
EACH _________._____ _________._____
0340 2407-0562900 9.000
BEAMS, PRETENSIONED
PRESTRESSED CONCRETE, BTB100
EACH _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0350 2408-7800000 8,421.000
STRUCTURAL STEEL LB _________._____ _________._____
0360 2414-6424110 402.000
CONCRETE BARRIER RAILING LF _________._____ _________._____
0370 2416-0100015 2.000
APRONS, CONCRETE, 15 IN. DIA. EACH _________._____ _________._____
0380 2416-0100024 10.000
APRONS, CONCRETE, 24 IN. DIA. EACH _________._____ _________._____
0390 2416-0100036 12.000
APRONS, CONCRETE, 36 IN. DIA. EACH _________._____ _________._____
0400 2416-1160015 28.000
CULVERT, CONCRETE ENTRANCE
PIPE, 15 IN. DIA.
LF _________._____ _________._____
0410 2416-1160024 152.000
CULVERT, CONCRETE ENTRANCE
PIPE, 24 IN. DIA.
LF _________._____ _________._____
0420 2416-1160036 434.000
CULVERT, CONCRETE ENTRANCE
PIPE, 36 IN. DIA.
LF _________._____ _________._____
0430 2416-1180024 59.000
CULVERT, CONCRETE ROADWAY
PIPE, 24 IN. DIA.
LF _________._____ _________._____
0440 2416-1180036 68.000
CULVERT, CONCRETE ROADWAY
PIPE, 36 IN. DIA.
LF _________._____ _________._____
0450 2416-1262024 173.000
CULVERT, CONCRETE PIPE, 2000D,
TRENCHLESS, 24 IN. DIA.
LF _________._____ _________._____
0460 2501-0201057 1,950.000
PILES, STEEL, HP 10 X 57 LF _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0470 2501-0201473 2,730.000
PILES, STEEL, HP 14 X 73 LF _________._____ _________._____
0480 2501-6335010 300.000
PREBORED HOLES LF _________._____ _________._____
0490 2501-8400172
TEMPORARY SHORING LUMP SUM LUMP SUM _________._____
0500 2502-8212036 4,624.000
SUBDRAIN, LONGITUDINAL,
(SHOULDER) 6 IN. DIA.
LF _________._____ _________._____
0510 2502-8221306 18.000
SUBDRAIN OUTLET, DR-306 EACH _________._____ _________._____
0520 2505-4008120 240.000
REMOVAL OF STEEL BEAM
GUARDRAIL
LF _________._____ _________._____
0530 2505-4008300 50.000
STEEL BEAM GUARDRAIL LF _________._____ _________._____
0540 2505-4008420 4.000
STEEL BEAM GUARDRAIL BARRIER
TRANSITION SECTION, BA-221
EACH _________._____ _________._____
0550 2505-4021010 4.000
STEEL BEAM GUARDRAIL END
ANCHOR, BOLTED
EACH _________._____ _________._____
0560 2505-4021722 4.000
STEEL BEAM GUARDRAIL TANGENT
END TERMINAL, BA-225
EACH _________._____ _________._____
0570 2505-6765006 146.000
REMOVE AND REINSTALL FORMED
STEEL BEAM GUARDRAIL
LF _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0580 2507-2638650 16.000
BRIDGE WING ARMORING - EROSION
STONE
SY _________._____ _________._____
0590 2507-3250005 1,778.000
ENGINEERING FABRIC SY _________._____ _________._____
0600 2507-4011100 33.000
CONCRETE GROUT FOR
REVETMENT OR GABION
CY _________._____ _________._____
0610 2507-6800061 2,034.000
REVETMENT, CLASS E TON _________._____ _________._____
0620 2510-6745850 11,057.000
REMOVAL OF PAVEMENT SY _________._____ _________._____
0630 2515-2475008 1,496.400
DRIVEWAY, P.C. CONCRETE, 8 IN. SY _________._____ _________._____
0640 2515-6745600 1,727.900
REMOVAL OF PAVED DRIVEWAY SY _________._____ _________._____
0650 2517-4225210 103.000
RAILROAD APPROACH SECTION,
P.C.C.
SY _________._____ _________._____
0660 2519-1002072 170.000
FENCE, CHAIN LINK, 72 IN. HEIGHT LF _________._____ _________._____
0670 2519-4200120 213.000
REMOVAL OF FENCE, CHAIN LINK LF _________._____ _________._____
0680 2524-6765010 4.000
REMOVE AND REINSTALL SIGN AS
PER PLAN
EACH _________._____ _________._____
0690 2524-6765110 16.000
REMOVAL OF TYPE A SIGN EACH _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0700 2524-9081261 2.000
CONCRETE FOOTING FOR
BREAKAWAY SIGN POST, 2'-8" DIA. X
6'-0"
EACH _________._____ _________._____
0710 2524-9130011 4.000
GUIDANCE MARKER, CHEVRON W1-8
(SPECIAL)
EACH _________._____ _________._____
0720 2524-9276010 164.000
PERFORATED SQUARE STEEL TUBE
POSTS
LF _________._____ _________._____
0730 2524-9276021 16.000
PERFORATED SQUARE STEEL TUBE
POST ANCHOR, BREAK-AWAY SOIL
INSTALLATION
EACH _________._____ _________._____
0740 2524-9325001 121.200
TYPE A SIGNS, SHEET ALUMINUM SF _________._____ _________._____
0750 2524-9325150 16.000
INSTALL TYPE A SIGN EACH _________._____ _________._____
0760 2527-9263137 16.000
PAINTED SYMBOLS AND LEGENDS,
WATERBORNE OR SOLVENT-BASED
EACH _________._____ _________._____
0770 2527-9263181 79.500
PAVEMENT MARKINGS REMOVED STA _________._____ _________._____
0780 2527-9263209 176.230
PAINTED PAVEMENT MARKINGS,
WATERBORNE OR SOLVENT-BASED
STA _________._____ _________._____
0790 2528-2518000 15.000
SAFETY CLOSURE EACH _________._____ _________._____
0800 2528-8400048 5,812.500
TEMPORARY BARRIER RAIL,
CONCRETE
LF _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0810 2528-8400256 2.000
TEMPORARY TRAFFIC SIGNALS EACH _________._____ _________._____
0820 2528-8445110
TRAFFIC CONTROL LUMP SUM LUMP SUM _________._____
0830 2528-8445113 100.000
FLAGGERS EACH 660.00000 66,000.00
0840 2528-9290050 14.000
PORTABLE DYNAMIC MESSAGE SIGN
(PDMS)
CDAY _________._____ _________._____
0850 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
0860 2551-0000120 15.000
TEMP CRASH CUSHION,
REDIRECTIVE (R)
EACH _________._____ _________._____
0870 2555-0000010
DELIVER AND STOCKPILE SALVAGED
MATERIALS
LUMP SUM LUMP SUM _________._____
0880 2595-0005105
RAILROAD PROTECTIVE LIABILITY
INSURANCE FOR BNSF RAILWAY CO.
LUMP SUM LUMP SUM _________._____
0890 2601-2632110 0.700
FERTILIZING ACRE _________._____ _________._____
0900 2601-2634100 5.500
MULCHING ACRE _________._____ _________._____
0910 2601-2636017 0.700
NATIVE GRASS SEEDING (INSTALL
ONLY)
ACRE _________._____ _________._____
0920 2601-2636043 2.700
SEEDING AND FERTILIZING (RURAL) ACRE _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:14 AM
Proposal Schedule of Items
Proposal ID: 78-C078-210 Call Order: 019 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 184'-0 X 62'-0 PRETENSIONED PRESTRESSED CONCRETE BEAM BRIDGE
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0930 2601-2636044 2.300
SEEDING AND FERTILIZING (URBAN) ACRE _________._____ _________._____
0940 2602-0000030 3,020.000
SILT FENCE FOR DITCH CHECKS LF _________._____ _________._____
0950 2602-0000071 3,020.000
REMOVAL OF SILT FENCE OR SILT
FENCE FOR DITCH CHECKS
LF _________._____ _________._____
0960 2602-0000101 320.000
MAINTENANCE OF SILT FENCE OR
SILT FENCE FOR DITCH CHECK
LF _________._____ _________._____
0970 2602-0000312 4,920.000
PERIMETER AND SLOPE SEDIMENT
CONTROL DEVICE, 12 IN. DIA.
LF _________._____ _________._____
0980 2602-0000351 4,920.000
REMOVAL OF PERIMETER AND
SLOPE OR DITCH CHECK SEDIMENT
CONTROL DEVICE
LF _________._____ _________._____
0990 2602-0010010 1.000
MOBILIZATIONS, EROSION CONTROL EACH 600.00000 600.00
1000 2602-0010020 1.000
MOBILIZATIONS, EMERGENCY
EROSION CONTROL
EACH 1,200.00000 1,200.00
Section: 0001 Total: _________._____
Total Bid: _________._____
DS- 23083
(Replaces DS-23076)
DEVELOPMENTAL SPECIFICATIONS
FOR
FIBER REINFORCEMENT FOR STRUCTURAL CONCRETE
Effective Date
January 21, 2026
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
SHALL PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23083.01 DESCRIPTION.
A. Fiber reinforcement shall be incorporated in the locations and quantities of concrete designated in
the contract documents. Work types for structures which may be designated for incorporation of
fiber reinforcement could include bridge substructures, bridge decks, bridge deck overlays,
structural repairs, or other applications.
B. Use approved products and proportions of synthetic macro fiber and incorporate into the concrete
mix in accordance with these developmental specifications. The purpose of the fiber
reinforcement is to mitigate risk and effects of cracking and improve the durability of the concrete.
C. Apply Section 2403 of the Standard Specifications, subject to the modifications herein. When
relevant to the work type, also apply Sections 2412 or 2413 of the Standard Specifications,
subject to the modifications herein.
D. The contract documents may designate incorporation of fiber reinforcement into concrete mixes
governed under other developmental specifications. Examples could include High Performance
Concrete for Structures, or Structural Concrete (4500 psi or Greater). Meet the provisions of
applied developmental specifications concurrently. The provisions for concrete slump specified in
DS-23083.02, A, 3, shall prevail over provisions for concrete slump specified in other applied
developmental specifications.
23083.02 MATERIALS.
A. General.
1. Fibers shall be incorporated as an admixture to the concrete mix. Adjustments to the base
volumetric proportions of mix constituents are not required to compensate for the volumetric
proportion of fiber admixture.
2. Select a concrete mix which satisfies all applicable requirements and achieves appropriate
workability upon incorporation of fibers at the required dosage rate.
DS-23083, Page 2 of 5
3. Material properties of the fiber reinforced concrete (FRC) shall comply with the material
properties for concrete specified elsewhere in the contract documents, except the following
relaxations are permissible for FRC slump:
a. Bridge Decks.
When mid-range water reducer is used with Class C or Class HPC-D mix, target slump
may be increased to 5 inches, allowing a maximum of 6 inches as a tolerance.
Commence testing for slump within 0 to 4 minutes after the FRC is discharged.
b. Bridge Deck Overlays.
When mid-range water reducer is used with Class HPC-O mix, target slump may be
increased to 5 inches, allowing a maximum of 6 inches as a tolerance. Commence
testing for slump within 0 to 4 minutes after the FRC is discharged.
B. Fiber.
1. General.
Fiber reinforcement shall consist of macro fibers.
2. Macro Fiber.
a. Use product approved in accordance with Materials I.M. 491.27 Appendix B.
b. Dose macro fiber at a minimum rate of 4 pounds per cubic yard of concrete.
C. Documentation and Acceptance of Fiber Reinforced Concrete.
1. FRC shall comply with ASTM C1116, Type III. Furnish documentary evidence by the fiber
manufacturer demonstrating satisfactory performance history and compliance with ASTM
C1116, Type III for fiber product(s) used.
2. A trial batch and test placement will be required in accordance with DS-23083.03, A.
Acceptance of the FRC mix shall be contingent on successful completion of the trial batch and
test placement. At a minimum, the trial batch and test placement must demonstrate all the
following:
• Compliance with the contract documents and specified material properties.
• Acceptable workability.
• Batching and finishing processes representative of the proposed means and methods of
construction for production work.
• No detrimental effects associated with mix inconsistency, mix segregation, bleeding, or
balling of fibers.
23083.03 CONSTRUCTION.
A. Trial Batch and Test Placement.
1. General.
a. Provide the Engineer notice, mix proportions, and scheduled date at least 7 calendar days
prior to trial batch and test placement. Do not proceed with trial batch and test placement
without authorization of the Engineer.
b. Conduct trial batch and test placement at least 7 calendar days prior to planned
placement of production FRC.
c. Do not place production FRC until the trial batch and test placement have been accepted
by the Engineer. Trial batches or test placements which fail to meet acceptance criteria
must be repeated at no additional cost to the Contracting Authority, following appropriate
material and/or procedure modifications by the Contractor.
d. After acceptance of the trial batch and test placement, any contractor-initiated changes to
the mix design, fiber product or dosage, mix batching process, and/or methods of
installation shall constitute basis for requiring a new trial batch and test placement at no
additional cost to the Contracting Authority.
DS-23083, Page 3 of 5
e. The Engineer may waive the trial batch and test placement on the basis of past
successful placement of the same combination of mix design, fiber product and dosage,
mix batching process (including key personnel), and installation process (including key
personnel).
2. Trial Batch.
a. Identify dedicated batching personnel for FRC.
b. Establish and demonstrate the sequence of constituent material introduction during the
trial batch. Ensure the fiber manufacturer’s technical representative is available for advice
and guidance regarding fiber inclusion into the mix, as needed.
c. Batch the trial batch concrete for slump within 1 inch of the maximum slump permitted, air
content of 6% +/- 1% intended target for the production placement ± 2%, and w/c ratio
typical of the production FRC to be placed. Include any other admixtures proposed for
use in the production FRC, including but not limited to water reducers, viscosity modifiers
and set retarders as applicable, at their respective intended production dosage rates.
d. Sample and test the trial batch placement for the following:
• Materials I.M. 340 – Unit Weight of Plastic Concrete.
• Materials I.M. 318 – Air Content of Plastic Concrete.
• Materials I.M. 317 – Slump of Plastic Concrete
• Visual Stability of Plastic Concrete – Following slump test performed in accordance
with Materials I.M. 317, leave slumped concrete undisturbed on the test board for 3
minutes and observe for mortar ring or bleed water at the base of the concrete.
Report presence, description, and size of any mortar ring and/or bleed water halo.
e. Trial batch volume shall be in accordance with the following:
• Bridge Decks and Deck Overlays: 6 cubic yards, minimum.
• Non-Deck Applications; 3 cubic yards, minimum.
3. Test Placement.
a. General.
1) Utilize the trial batch concrete to conduct a test placement. Subject to the
requirements herein, the test placement may not require use of the full volume of trial
batch concrete.
2) Test placement shall be made within side/edge forms, on sufficiently rigid subbase, to
allow representative demonstration of the placement and finishing methods proposed
for production work. Use a durable, impermeable separation barrier between the
subbase and test placement.
3) Place, consolidate and finish the concrete within the test placement using methods
that are representative of the methods to be used with the production concrete. For
production methods deemed impractical to duplicate during the test pour (e.g. pump
placement, self-propelled machine finishing), substitute methods may be used
subject to the Engineer’s approval, provided the substitute methods allow full
evaluation of any/all mix properties that may affect the actual production methods.
Evaluate workability, finishability, and general suitability of the mix for production use.
4) Following completion of the test placement, deposit any remaining trial batch
concrete to an open container or other accessible location to allow further inspection
for potential mix inconsistency, mix segregation, bleeding, balling of fibers, or other
detrimental properties. Do not obscure or dispose of the trial batch or test placement
concrete until a minimum time of 2 hours has elapsed after completion of the test
placement, or until authorized by the Engineer, whichever comes first.
b. Test Placement for Bridge Decks and Deck Overlays.
1) Simulate the general placement conditions for production concrete. Conduct the test
placement in open air, during weather generally consistent with the anticipated
conditions during production placement.
2) Following trial batching, suspend the test placement for a period of time
approximately equal to the anticipated delivery time for production concrete. During
this suspension, maintain the concrete in a state of agitation generally representative
DS-23083, Page 4 of 5
of the anticipated delivery conditions for production concrete.
3) The area of the test placement shall be a minimum of 200 square feet. The least
horizontal dimension of the test placement shall be a minimum of 12 feet. Nominal
thickness of the test placement shall match as close as practical the nominal
thickness of the production concrete, except nominal thickness of the test placement
need not exceed 9 inches.
4) Test placements for bridge decks shall include reinforcing steel, oriented in two mats
of two layers each (longitudinal and transverse). Reinforcing steel shall have similar
size, spacing, top clearance to top mat and bottom clearance to bottom mat, as
shown in the contract documents for the production work. No reinforcing steel is
required for test placements for bridge deck overlays.
c. Test Placement for Non-Deck Applications.
Deposit the trial batch concrete into formwork with minimum dimensions of at least 3 feet
length by 3 feet width by 3 feet depth. Alternate formwork dimensions may be permitted,
subject to approval by the Engineer.
B. Production FRC.
1. Batching.
a. Production batching methods, equipment, sequence and personnel shall match those
used for the approved trial batch.
b. Introduce fibers into the mix in accordance with the fiber manufacturer’s
recommendations, unless otherwise approved by the Engineer.
c. Mix FRC in accordance with the Standard Specifications applicable for concrete, unless
otherwise approved by the Engineer.
d. Ensure uniform distribution and random orientation of fibers throughout the concrete.
2. Placing, Consolidating, Finishing and Curing.
Comply with provisions for concrete specified in Sections 2403, 2412, and 2413 of the
Standard Specifications, as well as other applied developmental specifications, as applicable
to the contract and the work type.
23083.04 METHOD OF MEASUREMENT.
A. Fiber Reinforcement for Structural Concrete.
1. Fiber reinforcement for structural concrete shall be measured and paid separate from the
concrete the fiber reinforcement is incorporated in. Measurement and payment for the
concrete shall be as specified elsewhere in the contract documents.
2. The unit of measurement for Fiber Reinforcement for Structural Concrete shall match the unit
of measurement applicable to the concrete the fiber reinforcement is incorporated in (ex. per
square yard or per cubic yard).
3. The quantity of Fiber Reinforcement for Structural Concrete will be the quantity shown in the
contract documents. The quantity of Fiber Reinforcement for Structural Concrete shall match
the quantity of the concrete the fiber reinforcement is incorporated in.
B. Trial Batch and Test Placement.
Trial Batch and Test Placement is a combined lump sum item.
23083.05 BASIS OF PAYMENT.
A. Fiber Reinforcement for Structural Concrete.
Payment with be at the contract unit price for Fiber Reinforcement for Structural Concrete.
Payment includes all cost of furnishing and incorporating fiber reinforcement, at the specified
DS-23083, Page 5 of 5
dosage rate, per applicable unit of concrete.
B. Trial Batch and Test Placement.
Payment will be at the lump sum contract unit price for the combined bid item Trial Batch and
Test Placement. Payment includes full compensation for Trial Batch and Test Placement,
inclusive of all materials and labor for furnishing, forming, placing, finishing, and evaluating.
DS-23057
(New)
DEVELOPMENTAL SPECIFICATIONS
FOR
WORK ON RAILROAD RIGHT-OF-WAY (BNSF RAILWAY)
Effective Date
June 18, 2024
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
SHALL PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23057.01 DESCRIPTION.
This Special Provision outlines the Contractor’s requirements with Burlington Northern Santa Fe Railway
(BNSF). Portions of the Special Provision may apply to both the prime contractor and subcontractors. It is
the prime contractor’s responsibility to ensure subcontractor compliance with these requirements.
23057.02 CONTRACTOR RESPONSIBILITIES
A. General.
1. Upon execution of the contract, coordinate with BNSF as outlined in Exhibit “C” and execute a
copy of the agreement found in Exhibit “C-1”.
2. Submit copies of all correspondence with BNSF to the Engineer within 1 business day of
receipt.
3. Payments required by the Contractor to BNSF for train delays shall be borne by the Contractor
and are not reimbursable by the Department to the Contractor.
4. Article 3A of Exhibit “C” states: “Any damage to railway facilities resulting from Contractor's
operations will be repaired or replaced by Railway and the cost of such repairs or replacement
must be paid for by the Agency.” If the Department incurs costs from the Railroad in this
manner, the Department will recoup these costs from the Contractor.
5. Article 3F of Exhibit “C” states: “The cost of tell-tales or protective devices will be borne by the
Contracting Authority.” If the Department incurs costs from the Railroad in this manner, the
Department will recoup these costs from the Contractor.
B. Railroad Flagging.
1. Reimbursement to the Railroad.
a. It shall be understood that any reference to payment for flagging in the attachments, by
the Contracting Authority to BNSF, shall be paid by the Contractor. The Contractor shall
be responsible for coordinating all flagging activities with BNSF’s Roadmaster.
b. In the event Contractor fails to reimburse Railroad, the Contracting Authority will
reimburse the Railroad within 30 calendar days of the Contractor defaulting on the
payment (default is defined as non-payment within 30 calendar days of final billing by the
Railroad to the Contractor). Failure of the Contractor to reimburse the Railroad may result
in a reduction or suspension of the Contractors bidding qualifications according to Article
1102.03 of the Standard Specifications.
2. Documentation and Reimbursement to the Contractor.
a. Contractor shall initially pay invoices for all flagging costs in conjunction with railroad
flaggers when any of the conditions identified in this Special Provision, warrant a flagger.
The Contracting Authority will reimburse the Contractor for any daily cost that exceeds
$1,600 per day for the cost of flagger services provided by the Railroad. Contracting
Authority will reimburse the Contractor 100% of the total cost of flagger services, as
deemed necessary by the Railroad, that does not meet any of the conditions identified in
this Special Provision, unless the flagger’s presence on the project was a result of the
Contractor’s communication, or lack of communication, with the Railroad. The
Contracting Authority will reimburse the Contractor following receipt of documentation
verifying the Railroad invoices have been paid.
b. For each day that railroad flaggers have been provided, the Contractor shall document
daily the conditions on the project site that warrant the flagger. The Contractor shall
submit the daily records to the Engineer each week. The Engineer will review the daily
logs and promptly notify the Contractor if any information in the daily log is believed to be
incorrect.
c. Contractor shall forward copies of the invoices received from the Railroad for flaggers
and a summary of the flagging costs incurred that exceed the Contactors' requirements
described in this Special Provision, to the Engineer with a request for payment for the
additional railroad flagger costs. The Engineer will review the Contractor’s daily logs
against the Railroad’s invoice and make payment for the eligible costs in accordance with
Article 1109.03 of the Standard Specifications.
d. Contractor shall be responsible to Railroad for all flagging costs. Flagging costs for
subcontracted work shall be the responsibility of the Contractor. Reimbursement from
subcontractors to the Contractor shall be the sole responsibility of the Contractor.
e. Contractor shall forward, to the Engineer, copies of payments made to Railroad for
flagging costs.
3. Final payment to the Contractor will not be made by the Engineer until all flagging or other
protective services and/or temporary grade crossing expenses have been billed and paid to
the Railroad. Contractor shall provide to the Engineer monthly copies of invoices and
evidence of payment to the Railroad.
4. Railroad will notify the Engineer and Contractor when non-compliance is reported by Railroad
train crews or other Railroad employees. Contractor work performed without proper flagging
services, when such flagging is required, will be subject to a $5,000.00 per day price
adjustment to Contractor and may result in the removal of Contractor by Railroad or Engineer
from the project.
C. Insurance.
1. Before the contract is awarded, Contractor shall submit to the Department a certificate or
certificates of insurance evidencing all required coverages. The certificate(s) shall identify the
insurance company firm name and address, Contractor firm name, policy period, type of
policy, limits of coverage, and scope of work covered (including project number). Policies
shall provide no less than 30 calendar days prior written notice to Contracting Authority and
Railroad of cancellation or material change in policies. Following award of the Contract, the
Contractor shall submit a certificate of insurance evidencing the foregoing coverage to the
Railroad and Contracting Authority (if other than the Department), and a certified, true, andDS-23057, Page 2 of 25
complete copy of policy or policies to the Contracting Authority and Railroad. Upon request
from either the Contracting Authority or Railroad, a certified duplicate original of any required
certificate or policy shall be furnished at no cost to the Contracting Authority or Railroad. The
Contractor shall not begin work upon or over Railroad’s ROW until the Railroad has notified
the Engineer that such insurance provisions are in accordance with the contract documents.
The insurance shall be kept in full force and effect during the performance of work and
thereafter until the Contract
- Package Files
- Name
- 15DEC019\Plan\78-C078-210\78-C078-210.pdf
- Bytes
- 100094448
- Name
- 15DEC019\Prop\DS-23057.pdf
- Bytes
- 901260
- Name
- 15DEC019\Prop\DS-23083.pdf
- Bytes
- 140721
- Name
- 15DEC019\Prop\estprop019.pdf
- Bytes
- 350057
- Name
- 15DEC019\Prop\SS-23009.pdf
- Bytes
- 101432
- Package Pages
- 46
- Categorized By
- llm
- Package Scope Docs
- 3
- Package Manifest Only
- No