CONTRACTS AND SPECIFICATIONS BUREAU
Proposal
Proposal ID: 82-1827-711 Letting Date: December 15, 2026
Call Order: 023
Proposal Work Type: BRIDGE REPLACEMENT - PPCB
DBE Goal: 0.0%
Contracting Authority: CITY OF DAVENPORT
Proposal Guaranty: $100,000.00
This proposal includes the following project(s):
Project Number: BROS-1827(711)--8J-82 County: SCOTT
Project Work Type: BRIDGE REPLACEMENT - PPCB Route: WISCONSIN AVE.
Location: In the city of Davenport, On WISCONSIN AVE Over Duck Creek
Road System: URBAN
Federal Aid - Wages: Federal Aid - Predetermined Wages are in Effect
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Contract Time
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
Site ID Site Details Liquidated
Damages
00 Late Start Date 06/14/2027 95 WORK DAYS $1,000.00
.
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
Notes
Notes :
There are no notes for this proposal.
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Specifications List
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
Note Description
001.2023 *** STANDARD SPECIFICATIONS -- SERIES 2023 ***
The Iowa Department of Transportation STANDARD SPECIFICATIONS FOR
HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2023, plus applicable General
Supplemental Specifications, Developmental Specifications, Supplemental
Specifications AND Special Provisions shall apply to construction work on this contract.
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Specifications List
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
Note Description
005.1107.02 *** Revisions to Article 1107.02 ***
Article 1107.02, Insurance, is amended by the following modifications and additions.
This proposal note becomes null and void January 1, 2027.
A. It shall be the Contractor's responsibility to have liability insurance covering all
of the construction operations incident to contract completion and the Contractor must
have on file with the Contracting Authority a current "Certificate of Insurance" prior to
award of contract. The certificate shall identify the insurance company firm name and
address, Contractor firm name, policy period, type of policy, limits of coverage, and
scope of work covered (single contract or statewide). This requirement shall apply with
equal force, whether the work is performed by persons employed directly by the
Contractor including a subcontractor, persons employed by a subcontractor, or by an
independent contractor.
B. In addition to the above, the Contracting Authority shall be included as an
insured party, or a separate owner's protective policy shall be filed showing the
Contracting Authority as an insured party.
C. The liability insurance shall be written by an insurance company (or
companies) qualified to do business in Iowa. For independent contractors engaged
solely in the transportation of materials, the minimum coverage provided by such
insurance shall be not less than that required by Chapter 325A, Code of Iowa, for such
truck operators or contract carriers as defined therein. For all other contractors,
subcontractors, independent contractors, and the Contracting Authority, the minimum
coverage by such insurance shall be as follows:
General Liability, Including: BODILY INJURY
Independent Contractors $500,000 Each Occurrence
Contractual Liability, $500,000 Aggregate
Products and Completed PROPERTY DAMAGE
Operations $250,000 Each Occurrence
$250,000 Aggregate
or
BODILY INJURY AND PROPERTY DAMAGE
- COMBINED SINGLE LIMIT*
$750,000 Each Occurrence
$750,000 Aggregate
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Specifications List
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
Note Description
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
D. Failure on the part of the Contractor to comply with the requirements of this
article will be considered sufficient cause to suspend the work, withhold estimates, and
to deny the Contractor from receiving further contract awards, as provided in Article
1103.01.
410.11 *** STORM WATER POLLUTION PREVENTION PLAN ***
A Storm Water Pollution Prevention Plan has been developed by the Contracting
Authority for one or more projects on this contract. See the project plans (or other
contract document) for specific Storm Water Pollution Prevention Plan details.
500.01 *** WINTER WORK ***
The free time allowed between November 15 and April 1 will not be permitted on this
project. The Contractor shall work during the winter on all working days as defined in
Article 1101.03 'Working Day'.
DS-23083 DEVELOPMENTAL SPECIFICATIONS FOR FIBER REINFORCEMENT FOR
STRUCTURAL CONCRETE
FHWA-1273.09 FHWA-1273: REQUIRED CONTRACT PROVISIONS FEDERAL-AID
CONSTRUCTION CONTRACTS -- REVISED OCTOBER 23, 2023
23 U.S.C. 133(i) requires application of Davis Bacon predetermined wages on certain
projects on roads functionally classified as a local road or a rural minor collector. This
supersedes the applicability described in FHWA-1273 Section IV.
GS-23007 GENERAL SUPPLEMENTAL SPECIFICATIONS FOR HIGHWAY AND BRIDGE
CONSTRUCTION, OCTOBER 20, 2026 RELEASE
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Specifications List
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
Note Description
IA26-1.3 *** Additional Requirement ***
PREDETERMINED WAGE RATES - GENERAL DECISION NUMBER IA20260001
FOR HEAVY AND HIGHWAY CONSTRUCTION -- SCOTT COUNTY IN IOWA
*** Additional Requirement ***
Contracts where the Department is the Contracting Authority:
The Prime Contractor and each approved Subcontractor shall submit certified payrolls
weekly to the Project Engineer. Each Contractor shall use the AASHTOWare Project
Civil Rights and Labor (AWP CRL) software to electronically submit Certified Payroll
Reports. The Contractor shall list the craft for each employee covered by the
Predetermined Wage Rates. The Prime Contractor shall review and approve each
Subcontractor’s payroll within AWP CRL.
Contracts where the Department is not the Contracting Authority:
The Prime Contractor shall submit certified payrolls for itself and each approved
Subcontractor weekly to the Project Engineer. The Contractor may use the Iowa D.O.T.
Certified Payroll form or other approved form. The Contractor shall list the craft for
each employee covered by the Predetermined Wage Rates. The Prime Contractor
shall sign each of the Subcontractor's payrolls to acknowledge the submittal of the
Certified Payroll.
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 138'-10 X 28'-0 PPCB BRIDGE W/TWO 5' SIDEWALKS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0010 2101-0850002 8.000
CLEARING AND GRUBBING UNIT _________._____ _________._____
0020 2102-2625000 1,250.000
EMBANKMENT-IN-PLACE CY _________._____ _________._____
0030 2102-2710070 800.000
EXCAVATION, CLASS 10, ROADWAY
AND BORROW
CY _________._____ _________._____
0040 2104-2710020 150.000
EXCAVATION, CLASS 10, CHANNEL CY _________._____ _________._____
0050 2105-8425015 610.000
TOPSOIL, STRIP, SALVAGE AND
SPREAD
CY _________._____ _________._____
0060 2109-8225100 2.500
SPECIAL COMPACTION OF
SUBGRADE
STA _________._____ _________._____
0070 2113-0001100 512.000
SUBGRADE STABILIZATION
MATERIAL, POLYMER GRID
SY _________._____ _________._____
0080 2115-0100000 113.800
MODIFIED SUBBASE CY _________._____ _________._____
0090 2121-7425020 154.400
GRANULAR SHOULDERS, TYPE B TON _________._____ _________._____
0100 2122-5190008 106.400
PAVED SHOULDER, P.C. CONCRETE,
8 IN.
SY _________._____ _________._____
0110 2123-7450020 7.600
SHOULDER FINISHING, EARTH STA _________._____ _________._____
0120 2212-5070310 32.000
PATCHES, FULL-DEPTH REPAIR SY _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 138'-10 X 28'-0 PPCB BRIDGE W/TWO 5' SIDEWALKS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0130 2212-5070330 2.000
PATCHES BY COUNT (REPAIR) EACH _________._____ _________._____
0140 2301-0690203 373.200
BRIDGE APPROACH, BR-203 SY _________._____ _________._____
0150 2301-1033080 317.800
STANDARD OR SLIP FORM
PORTLAND CEMENT CONCRETE
PAVEMENT, CLASS C, CLASS 3
DURABILITY, 8 IN.
SY _________._____ _________._____
0160 2301-6911722
PORTLAND CEMENT CONCRETE
PAVEMENT SAMPLES
LUMP SUM LUMP SUM _________._____
0170 2303-6911000
HOT MIX ASPHALT PAVEMENT
SAMPLES
LUMP SUM LUMP SUM _________._____
0180 2312-8260050 66.000
GRANULAR SURFACING ON ROAD,
CLASS A CRUSHED STONE
CY _________._____ _________._____
0190 2401-6745625
REMOVAL OF EXISTING BRIDGE LUMP SUM LUMP SUM _________._____
0200 2402-2720000 156.000
EXCAVATION, CLASS 20 CY _________._____ _________._____
0210 2402-2721000 68.000
EXCAVATION, CLASS 21 CY _________._____ _________._____
0220 2403-0100010 406.000
STRUCTURAL CONCRETE (BRIDGE) CY _________._____ _________._____
0230 2403-1000005 203.600
FIBER REINFORCEMENT FOR
STRUCTURAL CONCRETE
CY _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 138'-10 X 28'-0 PPCB BRIDGE W/TWO 5' SIDEWALKS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0240 2403-1000010
TRIAL BATCH AND TEST PLACEMENT
(FIBER REINFORCED CONCRETE)
LUMP SUM LUMP SUM _________._____
0250 2404-7775000 15,894.000
REINFORCING STEEL LB _________._____ _________._____
0260 2404-7775005 60,351.000
REINFORCING STEEL, EPOXY
COATED
LB _________._____ _________._____
0270 2404-7775009 60.000
REINFORCING STEEL, STAINLESS
STEEL
LB _________._____ _________._____
0280 2407-0551142 12.000
BEAMS, PRETENSIONED
PRESTRESSED CONCRETE, A42
EACH _________._____ _________._____
0290 2407-0551150 6.000
BEAMS, PRETENSIONED
PRESTRESSED CONCRETE, A50
EACH _________._____ _________._____
0300 2408-7800000 4,205.000
STRUCTURAL STEEL LB _________._____ _________._____
0310 2412-0000100 391.200
LONGITUDINAL GROOVING IN
CONCRETE, BRIDGE DECK AND/OR
APPROACHES
SY _________._____ _________._____
0320 2414-6425410 319.700
CONCRETE BARRIER, REINFORCED,
SEPARATION
LF _________._____ _________._____
0330 2414-6444100 305.000
STEEL PIPE PEDESTRIAN HAND
RAILING
LF _________._____ _________._____
0340 2501-0201057 840.000
PILES, STEEL, HP 10 X 57 LF _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 138'-10 X 28'-0 PPCB BRIDGE W/TWO 5' SIDEWALKS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0350 2501-0201253 1,595.000
PILES, STEEL, HP 12 X 53 LF _________._____ _________._____
0360 2501-6335010 120.000
PREBORED HOLES LF _________._____ _________._____
0370 2502-8212034 594.900
SUBDRAIN, LONGITUDINAL,
(SHOULDER) 4 IN. DIA.
LF _________._____ _________._____
0380 2505-4008120 252.000
REMOVAL OF STEEL BEAM
GUARDRAIL
LF _________._____ _________._____
0390 2505-4008300 50.000
STEEL BEAM GUARDRAIL LF _________._____ _________._____
0400 2505-4008420 4.000
STEEL BEAM GUARDRAIL BARRIER
TRANSITION SECTION, BA-221
EACH _________._____ _________._____
0410 2505-4021010 4.000
STEEL BEAM GUARDRAIL END
ANCHOR, BOLTED
EACH _________._____ _________._____
0420 2505-4021722 4.000
STEEL BEAM GUARDRAIL TANGENT
END TERMINAL, BA-225
EACH _________._____ _________._____
0430 2507-3250005 923.000
ENGINEERING FABRIC SY _________._____ _________._____
0440 2507-6800061 630.000
REVETMENT, CLASS E TON _________._____ _________._____
0450 2507-8029000 52.000
EROSION STONE TON _________._____ _________._____
0460 2510-6745850 697.400
REMOVAL OF PAVEMENT SY _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 138'-10 X 28'-0 PPCB BRIDGE W/TWO 5' SIDEWALKS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0470 2519-1002048 309.700
FENCE, CHAIN LINK, 48 IN. HEIGHT LF _________._____ _________._____
0480 2519-4200190 40.000
REMOVAL OF FENCE, WOOD LF _________._____ _________._____
0490 2524-6765210 5.000
REMOVAL OF TYPE A SIGN
ASSEMBLY
EACH _________._____ _________._____
0500 2524-9276010 20.000
PERFORATED SQUARE STEEL TUBE
POSTS
LF _________._____ _________._____
0510 2524-9276021 2.000
PERFORATED SQUARE STEEL TUBE
POST ANCHOR, BREAK-AWAY SOIL
INSTALLATION
EACH _________._____ _________._____
0520 2524-9325001 10.000
TYPE A SIGNS, SHEET ALUMINUM SF _________._____ _________._____
0530 2524-9325150 2.000
INSTALL TYPE A SIGN EACH _________._____ _________._____
0540 2526-8285030
CONSTRUCTION SURVEY, RIGHT OF
WAY
LUMP SUM LUMP SUM _________._____
0550 2526-8285040
CONSTRUCTION SURVEY, LOCATION
SURVEY
LUMP SUM LUMP SUM _________._____
0560 2528-2518000 2.000
SAFETY CLOSURE EACH _________._____ _________._____
0570 2528-8445110
TRAFFIC CONTROL LUMP SUM LUMP SUM _________._____
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
SECTION: 0001
ITEMS FOR A 138'-10 X 28'-0 PPCB BRIDGE W/TWO 5' SIDEWALKS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0580 2528-9290050 28.000
PORTABLE DYNAMIC MESSAGE SIGN
(PDMS)
CDAY _________._____ _________._____
0590 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
0600 2601-2634100 1.200
MULCHING ACRE _________._____ _________._____
0610 2601-2634105 0.600
MULCHING, BONDED FIBER MATRIX ACRE _________._____ _________._____
0620 2601-2636043 0.600
SEEDING AND FERTILIZING (RURAL) ACRE _________._____ _________._____
0630 2601-2640350 218.000
SPECIAL DITCH CONTROL, WOOD
EXCELSIOR MAT
SQ _________._____ _________._____
0640 2602-0000020 1,788.000
SILT FENCE LF _________._____ _________._____
0650 2602-0000071 1,788.000
REMOVAL OF SILT FENCE OR SILT
FENCE FOR DITCH CHECKS
LF _________._____ _________._____
0660 2602-0000101 1,788.000
MAINTENANCE OF SILT FENCE OR
SILT FENCE FOR DITCH CHECK
LF _________._____ _________._____
0670 2602-0000150 100.000
STABILIZED CONSTRUCTION
ENTRANCE, EC-303
LF _________._____ _________._____
0680 2602-0010010 3.000
MOBILIZATIONS, EROSION CONTROL EACH 600.00000 1,800.00
0690 2602-0010020 2.000
MOBILIZATIONS, EMERGENCY
EROSION CONTROL
EACH 1,200.00000 2,400.00
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 82-1827-711 Call Order: 023 Letting Date: December 15, 2026
Section: 0001 Total: _________._____
Total Bid: _________._____
DS- 23083
(Replaces DS-23076)
DEVELOPMENTAL SPECIFICATIONS
FOR
FIBER REINFORCEMENT FOR STRUCTURAL CONCRETE
Effective Date
January 21, 2026
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
SHALL PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23083.01 DESCRIPTION.
A. Fiber reinforcement shall be incorporated in the locations and quantities of concrete designated in
the contract documents. Work types for structures which may be designated for incorporation of
fiber reinforcement could include bridge substructures, bridge decks, bridge deck overlays,
structural repairs, or other applications.
B. Use approved products and proportions of synthetic macro fiber and incorporate into the concrete
mix in accordance with these developmental specifications. The purpose of the fiber
reinforcement is to mitigate risk and effects of cracking and improve the durability of the concrete.
C. Apply Section 2403 of the Standard Specifications, subject to the modifications herein. When
relevant to the work type, also apply Sections 2412 or 2413 of the Standard Specifications,
subject to the modifications herein.
D. The contract documents may designate incorporation of fiber reinforcement into concrete mixes
governed under other developmental specifications. Examples could include High Performance
Concrete for Structures, or Structural Concrete (4500 psi or Greater). Meet the provisions of
applied developmental specifications concurrently. The provisions for concrete slump specified in
DS-23083.02, A, 3, shall prevail over provisions for concrete slump specified in other applied
developmental specifications.
23083.02 MATERIALS.
A. General.
1. Fibers shall be incorporated as an admixture to the concrete mix. Adjustments to the base
volumetric proportions of mix constituents are not required to compensate for the volumetric
proportion of fiber admixture.
2. Select a concrete mix which satisfies all applicable requirements and achieves appropriate
workability upon incorporation of fibers at the required dosage rate.
DS-23083, Page 2 of 5
3. Material properties of the fiber reinforced concrete (FRC) shall comply with the material
properties for concrete specified elsewhere in the contract documents, except the following
relaxations are permissible for FRC slump:
a. Bridge Decks.
When mid-range water reducer is used with Class C or Class HPC-D mix, target slump
may be increased to 5 inches, allowing a maximum of 6 inches as a tolerance.
Commence testing for slump within 0 to 4 minutes after the FRC is discharged.
b. Bridge Deck Overlays.
When mid-range water reducer is used with Class HPC-O mix, target slump may be
increased to 5 inches, allowing a maximum of 6 inches as a tolerance. Commence
testing for slump within 0 to 4 minutes after the FRC is discharged.
B. Fiber.
1. General.
Fiber reinforcement shall consist of macro fibers.
2. Macro Fiber.
a. Use product approved in accordance with Materials I.M. 491.27 Appendix B.
b. Dose macro fiber at a minimum rate of 4 pounds per cubic yard of concrete.
C. Documentation and Acceptance of Fiber Reinforced Concrete.
1. FRC shall comply with ASTM C1116, Type III. Furnish documentary evidence by the fiber
manufacturer demonstrating satisfactory performance history and compliance with ASTM
C1116, Type III for fiber product(s) used.
2. A trial batch and test placement will be required in accordance with DS-23083.03, A.
Acceptance of the FRC mix shall be contingent on successful completion of the trial batch and
test placement. At a minimum, the trial batch and test placement must demonstrate all the
following:
• Compliance with the contract documents and specified material properties.
• Acceptable workability.
• Batching and finishing processes representative of the proposed means and methods of
construction for production work.
• No detrimental effects associated with mix inconsistency, mix segregation, bleeding, or
balling of fibers.
23083.03 CONSTRUCTION.
A. Trial Batch and Test Placement.
1. General.
a. Provide the Engineer notice, mix proportions, and scheduled date at least 7 calendar days
prior to trial batch and test placement. Do not proceed with trial batch and test placement
without authorization of the Engineer.
b. Conduct trial batch and test placement at least 7 calendar days prior to planned
placement of production FRC.
c. Do not place production FRC until the trial batch and test placement have been accepted
by the Engineer. Trial batches or test placements which fail to meet acceptance criteria
must be repeated at no additional cost to the Contracting Authority, following appropriate
material and/or procedure modifications by the Contractor.
d. After acceptance of the trial batch and test placement, any contractor-initiated changes to
the mix design, fiber product or dosage, mix batching process, and/or methods of
installation shall constitute basis for requiring a new trial batch and test placement at no
additional cost to the Contracting Authority.
DS-23083, Page 3 of 5
e. The Engineer may waive the trial batch and test placement on the basis of past
successful placement of the same combination of mix design, fiber product and dosage,
mix batching process (including key personnel), and installation process (including key
personnel).
2. Trial Batch.
a. Identify dedicated batching personnel for FRC.
b. Establish and demonstrate the sequence of constituent material introduction during the
trial batch. Ensure the fiber manufacturer’s technical representative is available for advice
and guidance regarding fiber inclusion into the mix, as needed.
c. Batch the trial batch concrete for slump within 1 inch of the maximum slump permitted, air
content of 6% +/- 1% intended target for the production placement ± 2%, and w/c ratio
typical of the production FRC to be placed. Include any other admixtures proposed for
use in the production FRC, including but not limited to water reducers, viscosity modifiers
and set retarders as applicable, at their respective intended production dosage rates.
d. Sample and test the trial batch placement for the following:
• Materials I.M. 340 – Unit Weight of Plastic Concrete.
• Materials I.M. 318 – Air Content of Plastic Concrete.
• Materials I.M. 317 – Slump of Plastic Concrete
• Visual Stability of Plastic Concrete – Following slump test performed in accordance
with Materials I.M. 317, leave slumped concrete undisturbed on the test board for 3
minutes and observe for mortar ring or bleed water at the base of the concrete.
Report presence, description, and size of any mortar ring and/or bleed water halo.
e. Trial batch volume shall be in accordance with the following:
• Bridge Decks and Deck Overlays: 6 cubic yards, minimum.
• Non-Deck Applications; 3 cubic yards, minimum.
3. Test Placement.
a. General.
1) Utilize the trial batch concrete to conduct a test placement. Subject to the
requirements herein, the test placement may not require use of the full volume of trial
batch concrete.
2) Test placement shall be made within side/edge forms, on sufficiently rigid subbase, to
allow representative demonstration of the placement and finishing methods proposed
for production work. Use a durable, impermeable separation barrier between the
subbase and test placement.
3) Place, consolidate and finish the concrete within the test placement using methods
that are representative of the methods to be used with the production concrete. For
production methods deemed impractical to duplicate during the test pour (e.g. pump
placement, self-propelled machine finishing), substitute methods may be used
subject to the Engineer’s approval, provided the substitute methods allow full
evaluation of any/all mix properties that may affect the actual production methods.
Evaluate workability, finishability, and general suitability of the mix for production use.
4) Following completion of the test placement, deposit any remaining trial batch
concrete to an open container or other accessible location to allow further inspection
for potential mix inconsistency, mix segregation, bleeding, balling of fibers, or other
detrimental properties. Do not obscure or dispose of the trial batch or test placement
concrete until a minimum time of 2 hours has elapsed after completion of the test
placement, or until authorized by the Engineer, whichever comes first.
b. Test Placement for Bridge Decks and Deck Overlays.
1) Simulate the general placement conditions for production concrete. Conduct the test
placement in open air, during weather generally consistent with the anticipated
conditions during production placement.
2) Following trial batching, suspend the test placement for a period of time
approximately equal to the anticipated delivery time for production concrete. During
this suspension, maintain the concrete in a state of agitation generally representative
DS-23083, Page 4 of 5
of the anticipated delivery conditions for production concrete.
3) The area of the test placement shall be a minimum of 200 square feet. The least
horizontal dimension of the test placement shall be a minimum of 12 feet. Nominal
thickness of the test placement shall match as close as practical the nominal
thickness of the production concrete, except nominal thickness of the test placement
need not exceed 9 inches.
4) Test placements for bridge decks shall include reinforcing steel, oriented in two mats
of two layers each (longitudinal and transverse). Reinforcing steel shall have similar
size, spacing, top clearance to top mat and bottom clearance to bottom mat, as
shown in the contract documents for the production work. No reinforcing steel is
required for test placements for bridge deck overlays.
c. Test Placement for Non-Deck Applications.
Deposit the trial batch concrete into formwork with minimum dimensions of at least 3 feet
length by 3 feet width by 3 feet depth. Alternate formwork dimensions may be permitted,
subject to approval by the Engineer.
B. Production FRC.
1. Batching.
a. Production batching methods, equipment, sequence and personnel shall match those
used for the approved trial batch.
b. Introduce fibers into the mix in accordance with the fiber manufacturer’s
recommendations, unless otherwise approved by the Engineer.
c. Mix FRC in accordance with the Standard Specifications applicable for concrete, unless
otherwise approved by the Engineer.
d. Ensure uniform distribution and random orientation of fibers throughout the concrete.
2. Placing, Consolidating, Finishing and Curing.
Comply with provisions for concrete specified in Sections 2403, 2412, and 2413 of the
Standard Specifications, as well as other applied developmental specifications, as applicable
to the contract and the work type.
23083.04 METHOD OF MEASUREMENT.
A. Fiber Reinforcement for Structural Concrete.
1. Fiber reinforcement for structural concrete shall be measured and paid separate from the
concrete the fiber reinforcement is incorporated in. Measurement and payment for the
concrete shall be as specified elsewhere in the contract documents.
2. The unit of measurement for Fiber Reinforcement for Structural Concrete shall match the unit
of measurement applicable to the concrete the fiber reinforcement is incorporated in (ex. per
square yard or per cubic yard).
3. The quantity of Fiber Reinforcement for Structural Concrete will be the quantity shown in the
contract documents. The quantity of Fiber Reinforcement for Structural Concrete shall match
the quantity of the concrete the fiber reinforcement is incorporated in.
B. Trial Batch and Test Placement.
Trial Batch and Test Placement is a combined lump sum item.
23083.05 BASIS OF PAYMENT.
A. Fiber Reinforcement for Structural Concrete.
Payment with be at the contract unit price for Fiber Reinforcement for Structural Concrete.
Payment includes all cost of furnishing and incorporating fiber reinforcement, at the specified
DS-23083, Page 5 of 5
dosage rate, per applicable unit of concrete.
B. Trial Batch and Test Placement.
Payment will be at the lump sum contract unit price for the combined bid item Trial Batch and
Test Placement. Payment includes full compensation for Trial Batch and Test Placement,
inclusive of all materials and labor for furnishing, forming, placing, finishing, and evaluating.
- Package Files
- Name
- 15DEC023\Plan\82-1827-711\82-1827-711.pdf
- Bytes
- 21197058
- Name
- 15DEC023\Prop\DS-23083.pdf
- Bytes
- 140721
- Name
- 15DEC023\Prop\estprop023.pdf
- Bytes
- 300181
- Package Pages
- 19
- Categorized By
- llm
- Package Scope Docs
- 2
- Package Manifest Only
- No