Demo and replace sidewalk along various city streets in the City of Cadwell.
Remove existing 4-foot sidewalk and replace it with new 5-foot sidewalk along Coleman Street and Walnut Street, and remove sidewalk and then grade and grass the area where removed along certain areas along Coleman, Walnut and Snowhill Streets in accordance with plans and specifications, including fiber-reinforced 3,000 PSI concrete sidewalk, water valve cover replacement, topsoil grading and seeding, aggregate base at driveways, and Type D handicap ramps, with smooth driveway transitions and MUTCD signs meeting Department of Transportation guidelines for concrete sidewalk construction and installation.
We post new excavating opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-77465-NONST-2027-000000018), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.