The Gwinnett County Board of Commissioners (Owner) is requesting Bids for the construction of Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation
Please Note:
Ineligible Source List
During the period for which a person/firm has been debarred or suspended, or placed on the Gwinnett County ineligible source list, that person/firm shall not submit or cause to be submitted offers, quotes, bids, or proposals, etc. to Gwinnett County, even when automatically or electronically distributed a notification or notified of a solicitation request. Submittals from firms currently on the Gwinnett County ineligible source list will not be considered.
CONTRACT DOCUMENTS
FOR CONSTRUCTION OF
Tribble Mill Dam No. 2
(Chandler Lake) Rehabilitation
GCDWR Project No. F-0234-49
BL148-26
Volume 1 of 2
Prepared For:
Gwinnett County
Department of Water Resources
684 Winder Highway
Lawrenceville, GA 30045
Prepared By:
Hazen and Sawyer
211 Perimeter Center Pkwy
Suite 300
Atlanta, GA 30346
October 2026
Gwinnett County Department of Water Resources 00 11 16 - 1
Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation F-0234-49 10/2026
00 11 16
INVITATION TO BID
General Notice
The Gwinnett County Board of Commissioners (Owner) is requesting Bids for the construction of the
following Project pursuant to O.C.G.A. §36-91-20:
Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation
F-0234-49
This Project includes the following Work:
Rehabilitation of a low-hazard (Category II) dam in Tribble Mill Park including:
• installing and maintaining erosion control measures, temporary access roads, and
temporary pedestrian access measures;
• draining the lake, constructing a cofferdam, and installing and maintaining a water
diversion system;
• demolition of the existing concrete riser, concrete impact basin, and portions of the
spillway pipe and internal drain system adjacent to the riser and impact basin;
• constructing a new concrete riser, concrete impact basin, rip-rap outlet channel, and
portions of the spillway pipe and internal drain system adjacent to the riser and
impact basin;
• installing a cured-in-place pipe lining within the spillway pipe;
• removing trees (including root balls) from portions of the dam and auxiliary spillway,
performing surface repairs and minor grading, and establishing grass cover; and
• removing all temporary facilities and restoring the site including erosion control
measures, temporary access roads, temporary…
Rehabilitation of a low-hazard Category II dam in Tribble Mill Park including installing and maintaining erosion control, temporary access roads and temporary pedestrian access, draining the lake, constructing a cofferdam and water diversion system, demolition of the existing concrete riser, impact basin and adjacent spillway pipe and internal drain portions, construction of a new concrete riser, impact basin, rip-rap outlet channel and adjacent pipe and drain portions, cured-in-place pipe lining within the spillway pipe, tree and root-ball removal, surface repairs, minor grading, grass establishment, and removal of temporary facilities with site restoration.
We post new structural work opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-77023-NONST-2027-000000793), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.