Dalton Utilities requests bids from qualified manufacturers and suppliers for the engineering, manufacture, testing, documentation, delivery, and specified field services for a complete DC/UPS system at the J.D. Cope Energy Facility. The attached Technical Specification 197347.5.5430, Rev. 0, including the equipment datasheets, governs the technical scope. All bids should be submitted to dkeaton@dutil.com
Dalton Utilities
J.D. Cope Energy Facility
Whitfield County, GA
BMCD PROJECT NO. 197347
BMCD Specification No. 5.5430
DC/UPS System
Technical Specification
Date Revision Issue Status Approved
By
10/15/2026 0 Issued For Bid JCR
00 01 05 - 1
Dalton Utilities
J.D. Cope Energy Facility
5.5430 – UPS and DC System
Project No. 197347
Burns & McDonnell Engineering Company, Inc.
DOCUMENT 00 01 05 – INDEX AND CERTIFICATION PAGE
SPECIFICATION INDEX
DOCUMENT/
DIVISION DESCRIPTION
NUMBER
OF PAGES
Division 01 General Requirements 38
Division 26 Electrical 25
SECTION 00 01 05 – INDEX AND CERTIFICATION PAGE: continued
00 01 05 - 2
I hereby certify that specifications listed above were prepared by me or under my direct supervision and
that I am registered as a Professional Engineer under the laws of the State of Georgia.
Signature: _________________________
Typed or Printed Name:
Date: __________ Registration No.: ___________
00 01 10 - 1
Dalton Utilities
J.D. Cope Energy Facility
5.5430 – UPS and DC System
Project No.
The work includes design, fabrication, and delivery of one 125 VDC station battery with racks and spill containment, one 125 VDC battery fused disconnect switch, one 125 VDC station battery load test non-fused disconnect switch, two redundant paralleling battery chargers, one inverter with static transfer switch, one manual bypass switch, one isolation transformer/voltage regulator, one 125 VDC switchboard, one battery monitoring system (meeting NERC PRC-005-06), one battery lifting device, two 120VAC panelboards, and two 125 VDC panelboards. The supplier must also provide submittals, equipment data books, manufacturer's field services, spare parts, special tools, lubricants, and consumables.
We post new electrical opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-75553-NONST-2027-000000066), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.