Whitfield County invites sealed Statements of Qualifications from qualified professional engineering firms to provide engineering design services for drainage improvements and stormwater management.
REQUEST FOR QUALIFICATIONS
FOR
Engineering Design Services for Drainage Improvements
RFQ No.: 2026-104
Issued by:
Whitfield County Board of Commissioners
Whitfield County, Georgia
Request for Qualifications
Whitfield County invites sealed Statements of Qualifications (SOQ) from qualified professional
engineering firms to provide engineering design services for drainage improvements and
stormwater management in the Gillum Drive drainage basin in Dalton, Whitfield County,
Georgia. This procurement shall be conducted in accordance with all applicable federal, state,
and local public procurement laws and regulations.
SOQs will be received until the date and time listed below. Late submittals will not be accepted.
SOQs should be addressed to:
Whitfield County BOC Finance Dept.
C/O Brian McBrayer, 4th Floor
201 S. Hamilton St.
Dalton, GA 30720
Procurement Information
Item Information
RFQ Number 2026-104
Issue Date 09/04/2026
Final Questions Due 09/25/2026 at 6:00PM
Addenda Issued As Required; Final by 5:00PM on Monday, 09/28/2026
Proposal Due Date 10/05/2026 by 2:00PM EST
Submission Method Sealed Hard Copy (4 Copies)
Anticipated Award 10/12/2026
All questions regarding this RFQ must be submitted in writing to the person listed below. Verbal
responses shall not be binding.
Whitfield County Engineer:
Kent Benson, P.E.
kbenson@whitfieldcountyga.com
Project Description
The project consists of hydrologic analysis and engineering design services for drainage
improvements and stormwater management in the basin upstream of Gillum Drive in Whitfield
County. Also included are any required environmental studies, reports, and permitting.
The project was initially funded solely by local SPLOST sales tax funds. Whitfield County
contracted with Atlas, Inc.
The selected consultant shall provide all professional services necessary to complete the project, including reviewing existing data, conducting site visits and field investigations, conducting needed additional surveys, performing required environmental studies, developing preliminary and final concepts, coordinating with utility owners, producing bid-ready construction plans and easement/Right-of-Way plans, producing Engineer's opinion of probable cost, coordinating and obtaining environmental permitting, participating in coordination meetings, and producing bid documents and support.
We post new architecture and design opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Georgia Procurement Registry (solicitation PE-75500-NONST-2026-000000056), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.