Sealed bids for construction of 2025 Millen CDBG will be received until October 29th 2026 at 11:00 AM at the City of Millen City Hall at 919 College Ave, Millen, Georgia 30442 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Sanitary sewerage system rehabilitation including, but not limited to, replacing clay sewer mains with approximately 848-LF of 8" HDPE sewer mains using the pipe burst method as well as sewer lateral replacement and manhole rehabilitation. Water system improvements including, but not limited to, installation of 530-LF of 6" C-900 PVC water main, connecting to the existing system, and longside and shortside laterals. Drainage improvements including, but not limited to, installation of 945-LF of 24" rollover curb and gutter, 560-LF of 18" storm pipe, and 30-LF of 15" storm pipe. The project will also consist of curb inlets, grate inlets, roadway pavement overlay, sediment control, and grassing. Time allotted for completion of work is one hundred twenty (120) calendar days. Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable). The Contractor shall have a GA Utility Contractor's license. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. Funding by CDBG & City of Millen. This project is a Section 3 covered contract. Section 3 businesses are encouraged to apply. This contract is subject to BABAA.
City of Millen – 2025 Millen CDBG
Contract Documents & Technical Specifications
Parker Engineering, Inc. 00100-1
Proj. No. PE24101
SECTION 00100
ADVERTISEMENT FOR BIDS
PART 1. GENERAL
1.1 SEALED BIDS
Sealed bids for construction of 2025 Millen CDBG will be received until October 29th
2026 at 11:00 AM at the City of Millen City Hall at 919 College Ave, Millen,
Georgia 30442 at which time and place they will be publicly opened and read. Any bid
received after said time and date will not be considered by the Owner. No bid
may be withdrawn after the closing time for the receipt of bids for a period of sixty (60)
days.
1.2 SCOPE OF WORK
The work shall consist of furnishing all products and equipment and performing all labor
necessary to perform the following:
Sanitary sewerage system rehabilitation including, but not limited to, replacing clay sewer
mains with approximately 848-LF of 8” HDPE sewer mains using the pipe burst method as
well as sewer lateral replacement and manhole rehabilitation.
Water system improvements including, but not limited to, installation of 530-LF of 6” C-900
PVC water main, connecting to the existing system, and longside and shortside laterals.
Drainage improvements including, but not limited to, installation of 945-LF of 24” roll-over
curb and gutter, 560-LF of 18” storm pipe, and 30-LF of 15” storm pipe. The project will
also consist of curb inlets, grate inlets, roadway pavement overlay, sediment control, and
grassing.
Time allotted for completion of work is one hundred twenty (120) calendar days. All
Work shall be completed in accordance with the plans and specifications.
1.3 PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC.
The work consists of sanitary sewerage system rehabilitation including replacing clay sewer mains with approximately 848 LF of 8" HDPE sewer mains using the pipe burst method, sewer lateral replacement, and manhole rehabilitation; water system improvements including installation of 530 LF of 6" C-900 PVC water main, connecting to the existing system, and longside and shortside laterals; drainage improvements including installation of 945 LF of 24" rollover curb and gutter, 560 LF of 18" storm pipe, and 30 LF of 15" storm pipe; plus curb inlets, grate inlets, roadway pavement overlay, sediment control, and grassing. The time allotted for completion is 120 calendar days.
We post new asphalt opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-68250-NONST-2027-000000015), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.