The Town of Tyrone is soliciting bids for the removal and replacement of a generator at Sewer Pump Station 3.
Bids are due by November 4, 2026, and the solicitation was posted on October 6, 2026.
The procurement method is Competitive Sealed Bid.
The project involves removing and legally disposing of the existing generator and installing a new Cummins C125N6 propane generator, along with all associated work as specified in the Contract Documents and Technical Specifications.
Method
Competitive Sealed Bid
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Want to know if you can be bonded for this project? Get prequalified.One free application, soft pull — sized to your work.
Know you can be bonded before you spend a week on the bid
No scramble for a bond at the deadline — it becomes a request form
Remove and legally dispose of the existing generator at Sewer Pump Station 3.
Install a new Cummins C125N6 propane generator as specified in the Contract Documents and Technical Specifications.
Complete all associated work as called for in the project documents.
Posted Scope of Work
Removing and legal disposal of the existing generator, installation of a new Cummins C125N6 generator (Propane) set at Pump Station #3 as called for in the Contract Documents and Technical Specifications and along with all associated work, complete. Project PW-2026-05
More generators bids in Georgia, weekly.
We post new generators opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Questions & answers
AI-generated
What is the project?
Removing and legal disposal of the existing generator, installation of a new Cummins C125N6 generator (Propane) set at Pump Station #3 as called for in the Contract Documents and Technical Specifications and along with all associated work, complete.
Who is the buyer contact?
Katie Swann, Katie@tyronega.gov, 770-487-4038.
When are bids due?
November 4, 2026 at 10:00 AM ET.
Full source recordEvery field Georgia Procurement Registry published, untouched
Title
2026 Generator Replacement Sewer Pump Station 3
Detail
Fields
Invite
Invite ' + value.companyName + ' ' + value.contactName + ' '; }); htmlData = htmlData + ' '; showPopup( '', htmlData); } } } else { showPopup( "", "Error in searching vendor contact."); } initiateSelfInvite(); }); } else { showPopup("", "Please enter a valid email address."); } }); $(".attachDownLink").on( "click", function() { $("#attachmentId").val( $(this).attr("data-attachmentId")); $("#sourceSystemType").val( $(this).attr( "data-sourceSystemType")); var requestTime = new Date().getTime(); if (attachmentId && sourceSystemType) { $.post("./downloadAttachment?" + requestTime, { attachmentId : attachmentId, sourceSystemType : sourceSystemType }, function(data) { }); } }); }); 2026 Generator Replacement Sewer Pump Station 3 Start Date: Oct 06, 2026 @ 05:37 PM ET End Date: Nov 04, 2026 @ 10:00 AM ET Ends In: 28 days Event Details Documents Event Details Event ID Event Type Event Status Purchase Type Category Type Government Type Fiscal Year Agency Site Show Details --> PE-66873-NONST-2027-000000041 Non-State Agency Open Non-State Agency Construction / Public Works city 2027 Link 66873 TYRONE, TOWN OF Buyer Contact: Katie Swann Katie@tyronega.gov 770-487-4038 --> Description Removing and legal disposal of the existing generator, installation of a new Cummins C125N6 generator (Propane) set at Pump Station #3 as called for in the Contract Documents and Technical Specifications and along with all associated work, complete. Project PW-2026-05 NIGP Codes Code
Removing and legal disposal of the existing generator, installation of a new Cummins C125N6 generator (Propane) set at Pump Station #3 as called for in the Contract Documents and Technical Specifications and along with all associated work, complete. Project PW-2026-05
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? Get prequalified once.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
Prequalified contractors know they can be bonded before they write the bid — and skip the application on every one of these. The bond becomes a request form and a copy of the RFP, not a scramble at the deadline.Prequalify For Bonding →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: Georgia Procurement Registry (solicitation PE-66873-NONST-2027-000000041), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.