City of Peachtree Corners (the Community) is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or organization(s) to provide consultant services for design and construction administration for an approximately 0.50 miles of new sidewalk along SR 141/Peachtree Parkway. The project will close two existing gaps in the City's pedestrian network by connecting sidewalks between Engineering Drive and Scientific Drive, and between Triangle Drive and Peachtree Corners Circle. The project will also include associated improvements such as grading, curb and gutter construction, sod replacement, and safety rail installation where warranted.
This Request for Qualifications (RFQ) seeks to identify potential providers for the Scope of Services for the project/contract listed in Exhibit I. Firms that respond to this RFQ and are determined by the Community to be sufficiently qualified, may be deemed eligible, and invited to offer a technical approach and/or possibly present and/or interview for these services. All respondents to this RFQ are subject to instructions communicated in this document and are cautioned to completely review the entire RFQ and follow instructions carefully. The Community reserves the right to reject any or all SOQs or Technical Approaches, and to waive technicalities and informalities at the discretion of the Community.
Date Posted: 9/8/2026
1
City of Peachtree Corners
Request for Qualifications
To Provide
Engineering Design Services
GDOT PI# 0021595
Gwinnett, Peachtree Corners – SR 141 @ 2 Locs in Peachtree Corners
PTC 25-08 SR 141 Sidewalks TAP
RFQ – PTC 25-08
Qualifications Due: October 9, 2026
City of Peachtree Corners
310 Technology Pkwy
Peachtree Corners, GA 30092
RFQ PTC 25-08
September 8, 2026
2
REQUEST FOR QUALIFICATIONS
PTC 25-08
Engineering Design Services
I. General Project Information
A. Overview
City of Peachtree Corners (the Community) is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or
organization(s) to provide consultant services for design and construction administration for an approximately 0.50
miles of new sidewalk along SR 141/Peachtree Parkway. The project will close two existing gaps in the City's
pedestrian network by connecting sidewalks between Engineering Drive and Scientific Drive, and between Triangle
Drive and Peachtree Corners Circle. The project will also include associated improvements such as grading, curb
and gutter construction, sod replacement, and safety rail installation where warranted.
This Request for Qualifications (RFQ) seeks to identify potential providers for the Scope of Services for the
project/contract listed in Exhibit I. Firms that respond to this RFQ and are determined by the Community to be
sufficiently qualified, may be deemed eligible, and invited to offer a technical approach and/or possibly present
and/or interview for these services. All respondents to this RFQ are subject to instructions communicated in this
document and are cautioned to completely review the entire RFQ and follow instructions carefully.
The selected consultant will provide engineering design services for the project, including preliminary engineering (project description, environmental survey boundary map, property owner notification, cultural resources and ecology early coordination letters, NEPA early coordination letter), fieldwork (land survey, archaeologist short report, ecologist resources survey report, historical resources survey report), public outreach, GDOT Concept Report, utility coordination, preliminary cost estimate for ROW and utility, avoidance and minimization measures meeting, environmental assessments of effects, preliminary field plan review, NEPA document and environmental certification, right-of-way plans and authorization, environmental permitting (stream buffer variance, nationwide 404, USACE), final field plan review, engineering design (construction plans, landscaping plans, cost estimates, bid document package), and construction phase assistance (contract agreement, pre-construction meeting, responses to questions, coordination with contractor and utility companies, laboratory and field testing, pay application review, inspection, final inspection, close-out documents).
We post new architecture and design opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Georgia Procurement Registry (solicitation PE-66790-NONST-2027-000000032), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.