The construction of ±1,832 LF of 18" RCP storm drain pipe; ±62 LF of 24" RCP storm drain pipe; ±53 LF of 36" RCP storm drain pipe; ±42 LF of 48" RCP storm drain pipe; ±31 new storm drainage structures (including curb inlets, ditch inlets, grate inlets, and storm manholes); ±6 new 1"x1" yard inlets; ±2 conflict/junction boxes; ±10 utility service conflicts; ±6,548 LF of 6x24 inch concrete curb and gutter; ±398 SY of concrete driveway replacement; ±512 SY of Class A concrete removal and replacement; patching, leveling, and resurfacing upon completion of pipe work including ±309 TONS of recycled asphalt concrete leveling and ±600 TONS of 9.5mm Superpave asphalt; striping; erosion control; grading and clearing within the drainage easement; traffic control; and all other appurtenances required to construct the project.
Eatonton is committed to Affirmatively Further Fair Housing. This project is covered under the requirements of Section 3 of the HUD Act of 1968. This contract opportunity is a Section 3 Covered Contract Section 3 Business Concerns are encouraged to apply. Eatonton is committed to providing all persons with equal access to its services, programs, activities, education and employment regardless of race, color, national origin, religion, sex, familial status, disability or age. Section 3 documents are required prior to Notice of Award.
Build America, Buy America (BABA) Contract Clause
All requirements of the Build America, Buy America (BABA) Act, 41 USC 8301 note, and all applicable rules and notices, as may be amended, shall be complied with if applicable to the infrastructure project. Pursuant to HUD's Notice, "Public Interest Phased Implementation Waiver for FY 2022 and 2023 of Build America, Buy America Provisions as Applied to Recipients of HUD Federal Financial Assistance' (88 FR 17001), any funds obligated by HUD on or after the applicable listed effective dates, are subject to BABA requirements, unless excepted by a waiver.
AB-1
ADVERTISEMENT FOR BIDS
Sealed bids will be received for the 2025 CDBG: Sanitary Sewer System & Storm Drain
Improvements, CDBG No. 25p-x-117-2-6787 at the Eatonton City Hall, 314 S Washington Avenue,
Eatonton, Georgia 31024 until December 2, 2026 at 11:00 am (Local Time), at which time they will be
publicly opened and read.
The work under this Contract will consist generally of the following:
The construction of ±1,832 LF of 18” RCP storm drain pipe; ±62 LF of 24” RCP storm drain pipe;
±53 LF of 36” RCP storm drain pipe; ±42 LF of 48” RCP storm drain pipe; ±31 new storm drainage
structures (including curb inlets, ditch inlets, grate inlets, and storm manholes); ±6 new 1’x1’ yard inlets; ±2
conflict/junction boxes; ±10 utility service conflicts; ±6,548 LF of 6x24 inch concrete curb and gutter; ±398
SY of concrete driveway replacement; ±512 SY of Class A concrete removal and replacement; patching,
leveling, and resurfacing upon completion of pipe work including ±309 TONS of recycled asphalt concrete
leveling and ±600 TONS of 9.5mm Superpave asphalt; striping; erosion control; grading and clearing within
the drainage easement; traffic control; and all other appurtenances required to construct the project
All work on the Project must be completed within 180 consecutive calendar days of date of notice to
proceed.
Bid shall be submitted on Bid Proposal Forms furnished for that purpose, in accordance with the
Contract Documents and the Plans and Specifications, which are on file and may be reviewed (by
appointment only) at the office of Hofstadter and Associates, Inc., Consulting Engineers, 4571 Arkwright
Road, Macon, Georgia 31210.
The work consists of constructing approximately 1,832 linear feet of 18-inch RCP storm drain pipe, 62 LF of 24-inch RCP, 53 LF of 36-inch RCP, 42 LF of 48-inch RCP; 31 new storm drainage structures (curb inlets, ditch inlets, grate inlets, storm manholes); 6 new 1'x1' yard inlets; 2 conflict/junction boxes; 10 utility service conflicts; 6,548 LF of 6x24 inch concrete curb and gutter; 398 SY of concrete driveway replacement; 512 SY of Class A concrete removal and replacement; patching, leveling, and resurfacing including 309 tons of recycled asphalt concrete leveling and 600 tons of 9.5mm Superpave asphalt; striping; erosion control; grading and clearing within the drainage easement; and traffic control.
We post new asphalt opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-66456-NONST-2027-000000010), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.