Project consists of Grade, Drain, Base, and Pave on Carver Street Extension. Please see Site Construction Plans and Erosion, Sedimentation, and Pollution Control Plans for full scope.
Map data © OpenStreetMap contributors, Microsoft, Esri Community Maps contributors, Map layer by Esri Powered by Esri
LIMITS OF CONSTRUCTION
LAT: 32.190531
LONG: -82.603984
LIMITS OF CONSTRUCTION
LAT: 32.189827
LONG: -82.597438
COVER0
N
WWW.ROBERTSCIVILENGINEERING.COM
CARVER STREET
IMPROVEMENTS
11/12/26
11/12/26
11/12/26
11/12/26
CARVER STREET
IMPROVEMENTS
Know what's below.
before you dig.Call
R
CONTENTS
SHEET
VICINITY MAP
REVISIONS
COVER
RCE PROJECT NUMBER: TBD
1
2
3
4
11/12/26
301 SEA ISLAND ROAD, SUITE 10
ST.SIMONS ISLAND, GA 31522
912-638-9681
2 E. BRYAN STREET, SUITE 1200B
SAVANNAH, GA, 31401
912-298-7006
8442 W BEAVER ST.
JACKSONVILLE, FL 32220
904-741-0099
4000 FABER PLACE DRIVE, SUITE 300
NORTH CHARLESTON, SC 29405
843-323-4224
ORIGINAL ISSUE DATE: 07/04/2026
OWNER
CITY OF MOUNT VERNON
CONTACT
TBD
EMAIL
TBD
ENGINEER
ROBERTS CIVIL ENGINEERING
CONTACT
BILL WEEKS
EMAIL
BWEEKS@ROBERTSCIVILENGINEERING.COM
MONTGOMERY COUNTY
PREPARED FOR:
CITY OF MOUNT VERNON
435 S RAILROAD AVENUE
MOUNT VERNON, GA 30445
912-583-2323
11/12/26
11/12/26
EROSION, SEDIMENTATION
AND POLLUTION CONTROL
PLANS 1" = 1000'
GRAPHIC SCALE
2000'0' 1000'
DRAINAGE AREA MAP01
INITIAL PHASE02
INTERMEDIATE PHASE03
FINAL PHASE04
NOTES05
DETAILS06-10
No. 046602
PROFESSIONAL
CERTIFIED DESIGN
PROFESSIONAL:
Jessica Vick, P.E.
The project consists of approximately 0.54 miles of grading, drainage, base, and paving on Carver Street Extension. Work includes clearing and grubbing, grading, installation of storm drain pipes and flared end sections, placement of graded aggregate base and recycled asphalt concrete (25 mm, 19 mm, and 12.5 mm Superpave), tack coat, guardrail, traffic control, mobilization, erosion control measures (temporary grassing, construction exits, check dams, silt fence, riprap, permanent grassing), and signing and marking (thermoplastic striping and highway signs).
We post new asphalt opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-66425-NONST-2027-000000004), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.