The Greenway Feasibility Study is a planning document requested to determine whether a proposed trail (and related improvements) can realistically be designed, funded, permitted, constructed, operated, and maintained. It helps decision-makers understand costs, benefits, risks, and potential alternatives before advancing to design.
RFQ # 26-33, Greenway Feasibility Study
Page 1
City of South Fulton, Georgia
Public Works
REQUEST FOR QUALIFICATIONS
FOR
RFQ NUMBER: 26-33
GREENWAY FEASIBILITY STUDY
ISSUED: September 11, 2026
QUALIFICATIONS DUE NO LATER THAN: 2.00 P.M. ET, October 29, 2026
City of South Fulton
Director of Procurement
4715 Frederick Dr. SW
South Fulton, GA 30336
RFQ # 26-33, Greenway Feasibility Study
Page 2
The City of South Fulton, Georgia
4715 Frederick Dr. SW., Atlanta, GA
30336
Phone: 470-809-7667
Website:
Procurement Department | South Fulton, GA
City of South Fulton, Public Works Department
REQUEST FOR QUALIFICATIONS #26-33
GREENWAY FEASIBILITY STUDY
SCHEDULE OF EVENTS DATE
Qualification Release Date: September 11, 2026
Non-Mandatory Pre-Qualification Conference:
Our staff will hold a Non-Mandatory Pre-Qualification Conference. For
the person(s) Qualifying, please refer to the information in the Instructions
to Consultants for details.
September 18, 2026, 11:00 AM
Deadline for questions:
Questions must be submitted online at:
https://www.Bidnetdirect.com/georgia/Cityofsouthfulton
October 2, 2026, 3:00 PM
Answers will be posted by addendum at:
https://www.Bidnetdirect.com/georgia/Cityofsouthfulton
October 9, 2026
All responses to this RFQ must be submitted online at:
https://www.Bidnetdirect.com/georgia/Cityofsouthfulton. Consultants are
required to submit responses to solicitations electronically. Assistance
with registering or using the platform, please call Bidnet Direct's Support
Team at 800-835-4603 ext. 2. To attend the Qualification Opening, please
refer to the Information and Instructions to Consultants.
The Consultant shall provide a Greenway Feasibility Study including: Need and Purpose analysis; Existing Conditions Assessment of land use, roadway network, sidewalks, utilities, environmental constraints, and topography; Route Alternatives Analysis comparing multiple alignments along roadways, utility corridors, stream corridors, railroad corridors, and park connections; Right-of-Way Evaluation; Environmental Review of wetlands, streams, floodplains, tree impacts, protected species, and cultural resources; Conceptual Design including 10-foot to 14-foot multi-use trail, trailheads, parking, bridges, lighting, and signage; Cost Estimates for design, right-of-way, utility relocations, environmental mitigation, construction, CEI, and contingency; Funding Opportunities analysis; Public Involvement Plan with a minimum of 3 meetings; and an Implementation Plan with recommended phasing.
We post new architecture and design opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Georgia Procurement Registry (solicitation PE-66020-NONST-2027-000000102), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.