The Douglas County Board of Commissioners is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or organization(s) to provide consultant services for "Engineering Services for SR 166 @ Post Road Intersection Project, P.I. # 0021183, Douglas County'.
NO CONFLICT OF INTEREST
Except as may be identified and explained below, the undersigned hereby certifies that: (a) no
member of the Board of Commissioners, elected, appointed, and employee of the Douglas County;
(b) no elected, appointed, and employed official or employee of the State of Georgia and of a
governing body, instrumentality, or political subdivision; (c) no relative of any persons described
above; (d) no member of and delegate to the Congress of the United States has an interest
whatsoever (regardless of how indirect and how remote that interest may be) in bidder’s
organization and in the proceeds of a Contract and agreement which might be made between bidder
and the Douglas County Board of Commissioners as a result of the, quote, or qualification statement
accompanied by this certification.
The undersigned certifies that he/she is legally authorized by the bidder to make the above
representation, and that the representation is true to the best of his/her knowledge and belief and
without deliberate omission of any inquiry which would to the best of his/her belief tend to change
the above representation. The undersigned understands that any representation made knowing it
to be false may disqualify the bidder from being awarded the Contract and future work by Douglas
County Board of Commissioners.
NOTE: THIS CERTIFICATION MUST BE SIGNED AND SUBMITTED WITH THIS BID.
EXCEPTIONS: (Please explain)
Signature:
Print Name:
Title: Telephone #:
Email:
Name of Company:
Address:
The selected consultant will provide engineering design services for improving the stop-controlled intersection at Highway 166 and Post Road, with a roundabout design anticipated. The scope includes project management and coordination, comprehensive project work plan, complete field surveys, concept report, preliminary design, survey, NEPA document preparation and environmental special studies, right-of-way plans, utility coordination, final design, construction phase services (including soil erosion control inspection, shop drawings review, RFI response, punch list review, and final inspection), and project closeout. The Engineer of Record (EOR) must prepare all design plans, sign and seal all work, and collaborate with Douglas County and GDOT through over-the-shoulder and formal design reviews. Key deliverables include preliminary and final plans, traffic studies, cost estimates, environmental documents, and bid packages. The project has envisioned milestones from a Preliminary Engineering Notice to Proceed in March 2027 through a project letting in May 2030.
We post new architecture and design opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-64800-NONST-2026-000000086), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.