The Clayton County Water Authority (CCWA) intends to contract with an
experienced licensed utility contractor to complete the Camp Creek Outfall
Replacement – Phase 1 Project. The purpose of the Project is to install
approximately 14,453 linear feet of new 36-inch and 30-inch gravity-flow sanitary
sewer replacing an existing 30-inch gravity-flow sanitary sewer. Multiple
reconnections of smaller existing sewers will be required to complete the work.
REQUEST FOR BID
Camp Creek Outfall Replacement – Phase 1
GEFA Funded Project
Bid Number 2026-PME-12
CLAYTON COUNTY WATER AUTHORITY
1600 Battle Creek Road
Morrow, GA 30260
SCHEDULE OF EVENTS DATE
Mandatory Pre-Bid Meeting & Site Visit
A Mandatory Site Visit will be held at the General Services Building,
located at at 9740 Thomas Rd. Jonesboro, GA 30238.
September 15,
2026 at 10:30 a.m.
Deadline for Questions
Questions must be submitted online through the Bonfire Portal at:
https://ccwa.bonfirehub.com/.
September 22,
2026 at 3:00 p.m.
Addendum Issued
Answers will be answered via addendum online through the Bonfire
Portal at: https://ccwa.bonfirehub.com/
September 29, 2026
Bid Opening
Responses will be opened during a virtual meeting via Microsoft
Teams. Solicitations must be submitted through the online Bonfire
Portal at:
https://ccwa.bonfirehub.com/. Submissions by other methods will not
be accepted.
October 8, 2026
at 3:00 p.m.2026-PME-12 Camp Creek Outfall Replacement - Phase 1
Table of Contents
Division 1 General Overview
Section 1 Request for Bids ................................................................................ 1
Section 2 General Overview .............................................................................. 2
2.1 Intent and Purpose ................................................................... 2
2.2 Georgia Environmental Finance Authority................................ 2
2.3 Bid Evaluation .......................................................................... 2
2.4 Addendum................................................................................ 3
Division 2 Bid Requirements
Section 1 Instructions to Bidders .......................................................................
The project involves installing approximately 14,453 linear feet of new 36-inch and 30-inch gravity-flow sanitary sewer to replace an existing 30-inch gravity-flow sanitary sewer, with multiple reconnections of smaller existing sewers. Work includes standard excavation and trenchless techniques, clearing and grubbing, access road construction, erosion control, flow interruption, dewatering, vibration monitoring, excavation, shoring, pipe work (bedding, installation, testing), manhole work (installation, invert construction, testing), backfill and compaction, cased-crossings, demolition, concrete work, and final acceptance. The majority of the work will be completed in the same location and alignment as the existing sanitary sewer.
We post new plumbing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Georgia Procurement Registry (solicitation PE-63125-NONST-2027-000000081), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.