The Project consists of replacing four (4) underdrains per specifications for the GAC filter system at the Amerson Water Treatment Plant. Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of _AWTP Filter Underdrain Replacement (the "Project') will be received by the Macon Water Authority (the "Owner'), at the Macon Water Authority, 537 Hemlock Street, Human Resources Training Room, Macon, Georgia 31201 until 2:00 P.M., local time, October 27, 2026, and then at said office publicly opened and read aloud. All bidders must attend a mandatory pre-bid meeting on-site at the Amerson Water Treatment Plant, Second Floor Conference Room at 10:00 A.M. on October 13, 2026. All bid questions must be submitted to the Owner by 10:00 A.M. on October 20, 2026. The Bidder should attend the pre-bid meeting in its entirety. The complete Invitation to Bid and contract documents can be found at https://maconwater.org/bids/construction/.
00020-1
Invitation to Bid
Rev. 01/26 5/28/26 AWTP Filter Underdrain Replacement
SECTION 00020
INVITATION TO BID
THE MACON WATER AUTHORITY
MACON, GEORGIA
Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the
installation of _AWTP Filter Underdrain Replacement (the “Project”) will be received by the
Macon Water Authority (the “Owner”), at the Macon Water Authority, 537 Hemlock Street, Human
Resources Training Room, Macon, Georgia 31201 until 2:00 P.M., local time, October 27, 2026, and
then at said office publicly opened and read aloud. All bidders must attend a mandatory pre-bid
meeting on-site at the Amerson Water Treatment Plant, Second Floor Conference Room at 10:00
A.M. on October 13, 2026. All bid questions must be submitted to the Owner by 10:00 A.M. on
October 20, 2026. The Bidder should attend the pre-bid meeting in its entirety.
The Project consists of replacing four (4) underdrains per specifications for the GAC filter system
at the Amerson Water Treatment Plant.
The Project will be awarded in one Contract. Fifty-one percent (51%) of the Work under the
Contract Documents must be self-performed by the General Contractor. The Project will be
awarded by base bid [or “by base bid plus selected alternates”] on a lump sum basis for the
performance and completion of all Work required by the Contract Documents.
The Contract Documents include, but may not be limited to, the Instructions to Bidders, the
Contract Agreement, the General Conditions, the Drawings, the Specifications (Divisions 01
through 46, inclusive, where applicable), and the forms of Bid Bond, Performance Bond, and
Payment Bond.
The work consists of furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of AWTP Filter Underdrain Replacement, specifically replacing four (4) underdrains per specifications for the GAC filter system at the Amerson Water Treatment Plant. The project will be awarded in one contract on a lump sum basis, and the general contractor must self-perform 51% of the work.
We post new plumbing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Georgia Procurement Registry (solicitation PE-33561-NONST-2027-000000074), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.