The intent of this project is to furnish and install all materials, labor, and services necessary to remove and replace the existing roofing systems on Roof Sections 2, 3, 4, and 5 at Coastal Empire Montessori Charter School. The existing roofing systems have reached or are nearing the end of their expected service life and are exhibiting active leaks. Work includes, but is not limited to, tear-off of existing roofing materials, deck and insulation preparation, installation of new insulation and membrane roofing, flashing, drainage, skylights, and all related components described below.
PROJECT SPECIFICATIONS
Coastal Empire Montessori Charter School
2001 Cynthia St, Savannah, Georgia
Roof Replacement Project — Roof Sections 2–5
Work will take place at Coastal Empire Montessori Charter School, 2001 Cynthia St, Savannah, Georgia.
The base bid shall include all work listed in the scope for Roof Sections 2, 3, 4, and 5, in their entirety.
Alternates are provided for each individual roof section as identified in the Bid Schedule at the end of this
document, so that the Owner may, at its discretion, award the project in whole or by individual section.
Roof Sections 1 and 6 are not included in this specification; they are not covered by the referenced contractor
proposal and are not part of this bid.
SCOPE OF WORK
The intent of this project is to furnish and install all materials, labor, and services necessary to remove and
replace the existing roofing systems on Roof Sections 2, 3, 4, and 5 at Coastal Empire Montessori Charter
School. The existing roofing systems have reached or are nearing the end of their expected service life and
are exhibiting active leaks. Work includes, but is not limited to, tear-off of existing roofing materials, deck
and insulation preparation, installation of new insulation and membrane roofing, flashing, drainage,
skylights, and all related components described below.
All associated work, including but not limited to demolition, roof tear-off, and installation of new roofing
systems, is included in this scope of work.
PROJECT SUMMARY
The scope of work is as follows:
The contractor must furnish and install all materials, labor, and services necessary to remove and replace the existing roofing systems on Roof Sections 2, 3, 4, and 5. Work includes tear-off of existing roofing materials, deck and insulation preparation, installation of new 1.5" ISO insulation and a fully adhered 60 mil TPO membrane roofing system, flashing, drainage, new TPO retrofit drains, new skylights with safety cages, and all related components. The contractor must also conduct a pre-job meeting, pull all necessary permits, conform to OSHA standards, clean the jobsite daily, and remove all demolished materials off the property.
We post new roofing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-55836-NONST-2027-000000002), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.