The Atlanta Regional Commission (ARC) is the regional planning and intergovernmental coordination agency for the metro Atlanta region. The ARC Office of Information Technology provides technology services to internal departments and partner agencies, with a focus on maintaining a secure, reliable, and highly available network infrastructure that protects the Agency's data assets. The offices at 229 Peachtree Street NE, Suite 100 rely on a centralized UPS to maintain the server room and IDF closets during a loss of electrical power supply.
The existing unit is a Schneider Electric MGE Galaxy 5000, 40 kVA, with a 480 VAC three-phase input and output. Schneider discontinued the Galaxy 5000 line in July 2021, so parts and service support are limited. Therefore, ARC is requesting proposals to furnish, deliver, install, and commission one three-phase Uninterruptible Power Supply (UPS) to replace its existing unit, with the work complete by December 31, 2026.
Because the unit must be delivered and installed by year end, every proposal must state the lead time for delivery and for installation, and proposals that cannot meet December 31, 2026 may be found non-responsive.
Request for Proposals
Uninterruptible Power Supply (UPS) Replacement
Site registration and application approval must be done prior to submitting a proposal.
All documents must be combined and submitted as one complete proposal.
Purpose and Background
The Atlanta Regional Commission (ARC) is the regional planning and intergovernmental coordination
agency for the metro Atlanta region. The ARC Office of Information Technology provides technology
services to internal departments and partner agencies, with a focus on maintaining a secure, reliable, and
highly available network infrastructure that protects the Agency’s data assets. The offices at 229
Peachtree Street NE, Suite 100 rely on a centralized UPS to maintain the server room and IDF closets
during a loss of electrical power supply.
The existing unit is a Schneider Electric MGE Galaxy 5000, 40 kVA, with a 480 VAC three-phase input and
output. Schneider discontinued the Galaxy 5000 line in July 2021, so parts and service support are limited.
Therefore, ARC is requesting proposals to furnish, deliver, install, and commission one three-phase
Uninterruptible Power Supply (UPS) to replace its existing unit, with the work complete by December 31,
2026.
Because the unit must be delivered and installed by year end, every proposal must state the lead time
for delivery and for installation, and proposals that cannot meet December 31, 2026 may be found non-
responsive.
Exhibit A: Scope of Work and Technical Specifications
The vendor shall provide a complete, turnkey replacement: equipment, freight, rigging, removal of the
old system, installation, startup, and training.
The vendor shall provide a complete, turnkey replacement including equipment, freight, rigging, removal of the old system, installation, startup, and training. The new UPS must be a three-phase, double-conversion (online) UPS, UL 1778 listed, with minimum 40 kVA capacity, 480 VAC three-phase input and output. The vendor must perform a site survey, deliver and rig equipment through a 36-inch-wide doorway, disconnect and lawfully dispose of the existing UPS and batteries, make electrical connections via a Georgia-licensed electrical contractor, perform factory-authorized startup and commissioning with a load-bank or live-load test, conduct cutover after hours or on a weekend, and provide on-site training and as-built drawings. The work must be complete by December 31, 2026.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-29016-NONST-2027-000000078), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.