The City of Meriden is seeking competitive bids for comprehensive electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant in Meriden, CT.
The solicitation period runs from November 18, 2026 to December 09, 2026, with an estimated total value stated.
The project involves replacing the fixed-speed system with advanced Variable Frequency Drives (VFDs) and upgrading the supporting electrical distribution infrastructure.
The plant operates at a maximum flow rate of 2.0 MGD and an average daily flow of 0.90 MGD, serving the East Side Carpenter Pressure Zone and Carpenter Avenue Tank.
Bids must be submitted via the OpenGov EPortal.
The procurement method is Invitation to Bid (ITB).
Method
Invitation to Bid
Documents
1 file
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Bidding this one? Get the bid bond — free.The documents here don’t name one, so read them yourself — but public work almost always wants a bid bond with the bid.
Replace the existing fixed-speed system with advanced Variable Frequency Drives (VFDs).
Fully upgrade the supporting electrical distribution infrastructure at the Evansville Water Treatment Plant.
Submit a competitive bid for comprehensive electrical and mechanical infrastructure improvements.
Deliver all work at the place of performance in Meriden, CT.
Posted Scope of Work
The City of Meriden is seeking competitive bids from qualified contractors for comprehensive electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant.
Originally constructed in 1970, the facility operates at a maximum flow rate of 2.0 MGD (million gallons per day) and an average daily flow of 0.90 MGD. The plant serves as the primary water supply for the East Side Carpenter Pressure Zone and the Carpenter Avenue Tank, drawing water from the East Well through three greensand media pressure filters.
The primary goal of this modernization project is to replace the inefficient, fixed-speed system with advanced Variable Frequency Drives (VFDs) and fully upgrade the supporting electrical distribution infrastructure.
Scope, read from the documentsAI-generated
The primary goal of this modernization project is to replace the inefficient, fixed-speed system with advanced Variable Frequency Drives (VFDs) and fully upgrade the supporting electrical distribution infrastructure. The plant, originally constructed in 1970, operates at a maximum flow rate of 2.0 MGD and an average daily flow of 0.90 MGD, serving as the primary water supply for the East Side Carpenter Pressure Zone and the Carpenter Avenue Tank, drawing water from the East Well through three greensand media pressure filters.
More electrical bids in Connecticut, weekly.
We post new electrical opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Susan Martel
142 East Main St Room 210 Meriden CT, 06450 United States
Tel: 203-630-4115
Fax: 203-630-3852
smartel@meridenct.gov
Bid Workflow
Bidid
146888
Pa Workflow
1
Pi Workflow
1
For Est Total Pa
1
For Est Total Pi
1
Infor Est Total Pa
1
Infor Est Total Pi
1
Addendum Workflow
1
Pa Workflow Status
0
Pi Workflow Status
3
For Est Total Addendum
1
Infor Est Total Addendum
1
Addendum Workflow Status
0
Ct Bidstatus
Name
Started
Status
2
D Status
Active
Public Status
Open
Description
The City of Meriden is seeking competitive bids from qualified contractors for comprehensive electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant.
Originally constructed in 1970, the facility operates at a maximum flow rate of 2.0 MGD (million gallons per day) and an average daily flow of 0.90 MGD. The plant serves as the primary water supply for the East Side Carpenter Pressure Zone and the Carpenter Avenue Tank, drawing water from the East Well through three greensand media pressure filters.
The primary goal of this modernization project is to replace the inefficient, fixed-speed system with advanced Variable Frequency Drives (VFDs) and fully upgrade the supporting electrical distribution infrastructure.
Has Addendums
No
Prtcp End Date
1794933489000
Bid Header Cats
Id
Bidid
146888
Catid
1163159
Cat Item
Cow
Y
Nic
72000000
Name
Building and Facility Construction and Maintenance Services
Catid
1163159
Mcatid
88297
Owner Oid
149300
Cow Leader
1163159
Description
Building and Facility Construction and Maintenance Services
Displaypage
1
Haschildren
265
Maxdisplaypage
1
Id
Bidid
146888
Catid
1163384
Cat Item
Cow
Y
Nic
72151500
Name
Electrical system services
Catid
1163384
Mcatid
15595
Owner Oid
149300
Cow Leader
1163384
Description
Electrical system services
Displaypage
1
Haschildren
2
Maxdisplaypage
1
Id
Bidid
146888
Catid
1166744
Cat Item
Cow
Y
Nic
00000000
Name
Unknown
Catid
1166744
Mcatid
87873
Owner Oid
149300
Cow Leader
1166744
Description
Unknown
Displaypage
1
Haschildren
443
Maxdisplaypage
1
Id
Bidid
146888
Catid
1163352
Cat Item
Cow
Y
Nic
72150000
Name
Specialized trade construction and maintenance services
Catid
1163352
Mcatid
88302
Owner Oid
149300
Cow Leader
1163352
Description
Specialized trade construction and maintenance services
Displaypage
1
Haschildren
2
Maxdisplaypage
1
Categorized By
llm
Collab End Date
1796245200000
Enable Scoring
N
No Line Item Bid
Y
Bid Class Type Id
666
Bid Payment Term
Bidid
146888
Ct Payment Term
Abbrev
VENDOR
Description
Vendor Specified
Payment Term Id
1
Collab Start Job
1863111
Estimated Total
1
Is Large Item Bid
N
Prtcp Begin Date
1794933489000
Bid Delivery Term
Bidid
146888
Location
All Bid's MUST be submitted via OpenGov EPortal -
https://procurement.opengov.com/portal/meridenct
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? The bid bond is free.
Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
You can have the bid bond before the deadline — one form, soft credit pull, A-rated surety. Prequalify instead and you skip the application on every bond after this one.Get the bid bond — free →Prequalify once instead (free) →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Required by the city at the permit stage, not with your bid. Inferred from where the work happens — confirm forms and amounts with the permit office before you start.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: State of Connecticut (CTsource) (bid 146888), retrieved via the CT DAS CTsource BidBoard (WebProcure). View the official posting, and always confirm requirements and deadlines with the issuing agency.