Amendment 0001 to Seawater pump renovation at the oyster breeding center, electrical and plumbing components present. See attached Statement of Work for details.
The Contractor shall furnish all labor, materials, equipment, transportation, and supervision required to complete the decommissioning, procurement, installation, and wiring of a new corrosion-resistant salt water pumping system and its supporting electrical distribution and plumbing infrastructure at the NEFSC, Milford CT facility. This includes removal of legacy disconnects, starters, wiring troughs, wiring, breakers, enclosures and plumbing piping; procurement and installation of Vanton Chem-Gard non-metallic horizontal centrifugal pump assemblies or equivalent; installation and configuration of four WEG variable frequency drives (VFDs) and associated NEMA 4X enclosures; upgrading local field instrumentation, current transducers, and electrical distribution wiring; and delivery of required on-site backup components.
We post new electrical opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98115""SEATTLE""WA""USA""WESTERN ACQUISITION DIVISION""7600 SAND POINT WAY NE BLDG 1,""Sol_1305M327Q0034_Amd_0001.pdf"172047"file"".pdf""1""2026-11-12T20:04:33.095+00:00""9f4b2f3fe3d04f8dbecb9ab66cc85227""public""0""public""8f813a9cde5b4e9fa1aad4db492f219c""0"9"0""Attachment 2 - Davis-Bacon Act WD CT20260023.pdf"68405"file"".pdf""1""2026-11-12T20:04:33.095+00:00""7e196570b3374739bc2f10677a9f570f""public""0""public""cc93ea4b95334b909b2bf292a8322d8f""0"8"0""Attachment 3 - RFI Tracker 1305M327Q0034 dated 11.12.2026.xlsx"84346"file"".xlsx""1""2026-11-12T20:04:33.095+00:00""3526ac1c7614449f9beb756e2cc1a768""public""0""public""ff2ad238445e47928be12d56d3c31ffc""0"7"0""Attachment 2 - Davis-Bacon Act WD MA20260001.pdf"68405"file"".pdf""1""2026-11-10T20:07:57.95+00:00""9699746dbd39498ca997031e316eb80f""public""2026-11-12T20:04:33.095+00:00""1""public""39608c3476fe4807b7cb8238776e9b69""0"6"0""2026-11-12T20:04:33.095+00:00""Attachment 4 - Past-Performance-Questionnaire 1305M327Q0034.docx"4532809"file"".docx""1""2026-11-10T20:07:57.95+00:00""cc750b01886e484894fa97c53d35a3cf""public""0""public""44dc7e664d854b23848ae1df41d0c6ee""0"5"0""Sol_1305M327Q0034.pdf"347065"file"".pdf""1""2026-11-10T20:07:57.95+00:00""a11b555f15f640dc969197b7a08227ea""public""0""public""c2e3d476ba6f4aa298a8bb9e2f5f9913""0"4"0""Attachment 01 - Statement of Work.docx.pdf"252266"file"".pdf""1""2026-11-10T20:07:57.95+00:00""da5f1477828143da922dc6c9c7fe9bb4""public""0""public""dd86fa0592604721a45cb552968401b5""0"3"0""Attachment 5 - Local Subcontracting Options.pdf"191801"file"".pdf""1""2026-11-10T20:07:57.95+00:00""d0d7b39f78bf4c9f8be83229b7fcaae0""public""0""public""87171c4913544d95aee17f137cb6cf72""0"2"0""Attachment 3 - RFI Tracker 1305M327Q0034.xlsx"12834"file"".xlsx""1""2026-11-10T20:07:57.95+00:00""b8b63613eb2c42a690889aa06ded1f61""public""2026-11-12T20:04:33.095+00:00""1""public""45917cad2aca494c953e2d5ab8f13bed""0"1"0""2026-11-12T20:04:33.095+00:00"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2a70224c02a049208ef4cffb362eefe7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.