James M Robb SP Island Acres Wastewater Improvements, C26CR1
The project consists of the removal and replacement of the existing submersible pump lift station with a new above ground lift station, removal and replacement of aeration basin liners and evaporation lagoon liners, and associated site work. The work includes 23 bid items: mobilization, construction surveying, demolition and site preparation, construction access improvements, remove and replace existing 5-ft fiberglass wet well, furnish and install new above ground lift station with bypass piping, furnish and install new sewage grinder with controller and mounting and retrieval systems, sludge removal and disposal from aeration basin and wet well, strip/stockpile/re-spread topsoil, salvage/stockpile/place cobble, excavation and placement at proposed berm location, excavation and haul-off of excess topsoil with testing, import and install liner bedding material, install new liner aeration basin, install new liner evaporation lagoon, cattail plantings evaporation lagoon, site restoration/seeding/mulching/cleanup, and time and equipment items for excavator, grader, loader, tandem dump truck, skid steer loader, and laborer.
We post new plumbing opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: DNR - Division of Parks & Wildlife (solicitation IFB1-PMAA-2027000045-2), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.