Sanitary Sewer Muffin Monster Replacement
Removal of all existing equipment and installation of a new Heavy-Duty Muffin Monster industrial sewage wastewater grinder in an existing wastewater grinder pit. The work includes one new 30004T-2410-DI Muffin Monster Upgrade, a new 5 HP TEXP electric motor, a new spool, a new 10" pipe diameter unibody housing, and one new PC2200 motor controller. It also includes all electrical connections, wiring, conduit, terminations, grounding, and power provision (460V/3PH/60HZ power and 120VAC control power), as well as any control tie-ins. The contractor must coordinate confined-space entry into the pit, remove remaining necessary components, install the new assembly, and execute startup and operational testing. Training and instructions are to be included. Any structural modifications should be included in the bid. All work must be performed according to OSHA and current life safety rules and regulations.
We post new plumbing opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Colorado work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CDHS - Office of Administrative Solutions (solicitation DQ1-IHHA-2027000189-1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.