The project includes furnishing all labor, equipment and materials required to complete the Keyes Road
over Wilder Brook Culvert Replacement Project. The project includes, but is not limited to phased
demolition of the existing CMP culvert, demolition of the existing road surface and sidewalk,
bank stabilization and grading, dewatering, dredging, roadway grading, water main relocation, installation
of a new 24-foot span 3-sided rigid frame bridge structure, installation of new HMA walkway a
Pre-Bid Conference: Held on-site at 10:00 a.m. on Wednesday, October 14, 2026.
We post new excavating opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1441-COG01-COG01-134215), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.