Entry Door Upgrade at State Aided Development: Chestnut Manor (667-2) in Arlington, Massachusetts
Pre-Bid Conference: 10/20/2026 at 10:00AM EDT Address: 54 Medford St , Arlington, MA 02474 Instructions: Meet at rear entrance
The project consists of adding a vestibule within the community room at the existing rear entrance. Work includes new storefront in 3 openings including 2 power-operated entry doors; partitions, painting, and ceiling systems; walk-off carpet tile flooring at vestibule; cabinetry, woodwork and counter; addition of HVAC equipment for vestibule; expand and modify existing intercom, security, fire alarm, and access control systems including new NVR system; electrical work including interior and exterior lighting; new accessible concrete walkway, landing, curbing; paved walkways; and metal railings.
We post new goods & materials opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1432-ARLTN-ARLTN-134198), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.