For constructing the Traffic Signal Modifications (Traffic Signal Installations with Flashing Beacons and Pedestrian Crosswalk/Flashing Beacons) on SR-88 at Watts Street, Lee Street, College Street, Harrison Street, Alberta/Webe Curenton Drive, East Grubbs Street, and Farmers Market near Kelly Street. Length 0.531 mi.
County: Coffee County, Alabama
Contract Time: 90 Working Days
Bracket Estimate: $1,208,520 to $1,477,080
Bids are received by the Alabama Department of Transportation, Office Engineer Bureau, Plans and Proposals Section. State law requires bidders to be pre-qualified with ALDOT.
For constructing the Traffic Signal Modifications (Traffic Signal Installations with Flashing Beacons and Pedestrian Crosswalk/Flashing Beacons) on SR-88 at Watts Street, Lee Street, College Street, Harrison Street, Alberta/Webe Curenton Drive, East Grubbs Street, and Farmers Market near Kelly Street over a length of 0.531 mi.
We post new electrical opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Alabama Department of Transportation (solicitation 20261204-CALL051), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.